Auckland Airport (AKL) Integrated ICS Concept and Developed Design

Auckland International Airport Limited (AIAL) brought in BNP to review the baggage handling system (BHS) plans in their Terminal Development Plan.

image overlay Complex transportation map with overlapping routes and colorful sections.

개요

Auckland International Airport Limited (AIAL) brought in BNP to review the baggage handling system (BHS) plans in their Terminal Development Plan. After the review, AIAL requested that BNP develop high-level BHS concept options. These included upgrading the current Hold Baggage Screening (HBS) from ECAC Standard 2 to Standard 3 and connecting the existing system with a new BHS facility to support the move of domestic passengers into the international terminal.

Technology Evaluation and Design

The concept work evaluated various BHS technologies, considering both conventional belt conveyors and Individual Carrier Systems (ICS). To overcome challenging space restrictions and accommodate airline requirements to minimize manual baggage handling, BNP developed a batching solution integrated with an ICS-based bag buffer to optimize make-up operations. This was matched with a redeveloped six-machine HBS system integrated downstream of a reconfigured check-in departures hall. Detailed phasing step plans and BHS cost estimates were developed to provide a pathway for construction and outline a budget through each stage of development.

Data-Driven Design Approach

All design work was data-driven, from the output of BNP’s demand analysis based on flight schedules to the required planning years. These demands were matched with appropriate BHS resources, evaluated against the client’s redundancy requirements, and then developed into a BHS design within the Revit BIM environment to coordinate with the broader design team (architecture, MEP, and structure).

Simulation and Testing

BNP created a dynamic simulation of the chosen design to show how bags would be handled on a typical busy day. The simulation also tested the system’s ability to recover from various types of failures. BNP then worked with AIAL to develop tender material and support the tender process for the procurement of BHS contractor services. During this period, BNP continued to develop the design in coordination with the Building Design Consultant (BDC).

Ongoing Support

Since the award of the BHS contractor, BNP has continued to support AIAL by providing construction administration services.

프로젝트 시작

2018

클라이언트

Auckland International Airport Limited

서비스 범위

  • Master Planning
  • Analysis and Demand Study
  • 컨셉 디자인
  • Dynamic Simulation
  • 입찰 문서
  • Tender Administration
  • 건설 관리

지역

Oceania

수하물 처리 시스템 성공 사례

image overlay New Terminal A Baggage Handling System at Newark Liberty International Airport (EWR)
수하물 처리 시스템

북미

뉴어크 리버티 국제공항(EWR)의 새로운 터미널 A 수하물 처리 시스템

는 뉴어크 리버티 국제공항(EWR)의 새로운 터미널 A의 수하물 처리 시스템(BHS)을 위한 설계 업체로 BNP를 선정했습니다.

image overlay Atlanta-Hartsfield International Airport (ATL) L-MOD Curbside Design
수하물 처리 시스템

북미

애틀랜타-하츠필드 국제공항(ATL) L-MOD 커브사이드 디자인

BNP 어소시에이츠는 HOK와 협력하여 남동쪽 커브사이드 컨베이어와 델타 대시 패키지 취급 시스템을 재설계하여 L-MOD 프로그램의 일환으로 추가되는 새로운 캐노피 지지대를 위한 공간을 확보했습니다.

image overlay Tampa International Airport (TPA) Outbound Baggage System Security Enhancement Project
수하물 처리 시스템

북미

탬파 국제공항(TPA) 출국 수하물 시스템 보안 강화 프로젝트

는 힐스버러 카운티 항공 당국으로부터 기존 30% 위탁 수하물 검사 시스템(CBIS) 설계를 검증하고 TSA 승인을 포함하여 100%를 개발하는 작업을 의뢰받았습니다.

성과를 위한 파트너십: 대규모 프로젝트에서 중간 규모의 성공까지.

강력한 명성을 바탕으로 중규모 프로젝트를 위한 비용 효율적인 솔루션을 제공하고 고객에게 최신 기술을 교육하며 장기적인 성공을 보장하는 역량을 선보이는 것을 목표로 합니다. 공항 계획 및 개발 부서의 소규모 팀과 긴밀히 협력하여 탁월한 결과를 제공하는 등 고객뿐 아니라 고객과의 관계 구축에 우선순위를 두고 있습니다.

정보 요청 프로젝트 보기

는 항공 운송 및 물류 산업에 전문 컨설팅 서비스를 제공하는 세계적인 선도 기업입니다. 

© 2025 BNP Associates, INC. 판권 소유