Chicago O’Hare International Airport (ORD) Terminal 5 BHS Redevelopment

BNP was the Baggage Handling System (BHS) design lead for Muller & Muller, Ltd. and the Chicago Department of Aviation, delivering improvements to the Chicago O’Hare International Airport Terminal 5 BHS.

image overlay Industrial interior with racks of machinery and electrical equipment.

개요

BNP was the Baggage Handling System (BHS) design lead for Muller & Muller, Ltd. and the Chicago Department of Aviation, delivering improvements to the Chicago O’Hare International Airport Terminal 5 BHS.

Design Challenges

The challenges presented with this redevelopment design included a lack of space, restrictive BHS clear heights within the existing bagroom, and the need for a comprehensive phasing plan to ensure ongoing operations during construction.

Design Solutions

To fully optimize the existing make-up area, the design team provisioned a new PGDS-compliant originating Checked Baggage Inspection System (CBIS) below a new East Head House expansion area. The make-up bagroom design included 15 new flat plate carousels, a dedicated recheck oversize screening area, a consolidated manual encode zone, and a new lane-based early bag storage system. The make-up area also provisioned adequate drive aisle circulation for the pre-clear and international arrival unloads occupying the shared space.

Construction Phasing

This phasing plan included over 30 installation and demolition steps, including temporary systems to ensure the Terminal 5 airlines could continue to screen and process baggage throughout construction.

프로젝트 시작

2018

클라이언트

Chicago Department of Aviation

서비스 범위

  • 분석 연구
  • 컨셉 디자인
  • 회로도 설계
  • 30% TSA Design Documents

지역

북미

수하물 처리 시스템 성공 사례

image overlay TSA Recapitalization and BHS Modernization at Denver International Airport (DEN)
수하물 처리 시스템

북미

TSA Recapitalization and BHS Modernization at Denver International Airport (DEN)

As an essential member of the PCL Construction Design-Build (DB) team, Studdiford Technical Solutions, LLC (STS) provides BHS subject matter expertise for the TSA Recapitalization and Baggage Handling System (BHS) Modernization program.

image overlay Orlando International Airport (MCO) South Terminal C Project
수하물 처리 시스템

북미

Orlando International Airport (MCO) South Terminal C Project

As a member of the BHS design‑build team, Studdiford Technical Solutions, LLC (STS) provided BHS subject matter expertise, design oversight, system integration support, and commissioning services for the South Terminal.

image overlay Terminal 2 BHS DeviceNet Replacement at Oakland San Francisco Bay Airport (OAK)
수하물 처리 시스템

북미

Terminal 2 BHS DeviceNet Replacement at Oakland San Francisco Bay Airport (OAK)

Studdiford Technical Solutions, LLC (STS) managed the modernization of the Terminal 2 baggage handling system through controls upgrades, commissioning, and implementation oversight.

성과를 위한 파트너십: 대규모 프로젝트에서 중간 규모의 성공까지.

강력한 명성을 바탕으로 중규모 프로젝트를 위한 비용 효율적인 솔루션을 제공하고 고객에게 최신 기술을 교육하며 장기적인 성공을 보장하는 역량을 선보이는 것을 목표로 합니다. 공항 계획 및 개발 부서의 소규모 팀과 긴밀히 협력하여 탁월한 결과를 제공하는 등 고객뿐 아니라 고객과의 관계 구축에 우선순위를 두고 있습니다.

정보 요청 프로젝트 보기

는 항공 운송 및 물류 산업에 전문 컨설팅 서비스를 제공하는 세계적인 선도 기업입니다. 

© 2025 BNP Associates, INC. 판권 소유