合作出成果:从大型项目到中等规模的成功。.
在建立良好声誉的同时,我们的目标是展示我们为中型项目提供高性价比解决方案的能力,向客户传授最新技术,确保他们取得长期成功。我们优先考虑与客户建立关系,而不仅仅是客户,经常与机场规划和开发部门的小型团队密切合作,以提供卓越的成果。.
BNP 已受聘为新航站楼设计行李处理系统 (BHS)。设计范围包括所有行李系统的概念设计和详细设计,将 GTC 集成到航站楼的行李网络,以及规划未来与卫星航站楼的连接。.
China West Airport Group is developing a major new terminal spanning approximately 700,000 square meters, designed to accommodate up to 50 million passengers annually by 2030. To enhance connectivity and passenger convenience, a new Ground Transportation Center (GTC) will be constructed adjacent to the terminal to offer seamless links to subways, highways, and railways.
BNP 已受聘为新航站楼设计行李处理系统 (BHS)。设计范围包括所有行李系统的概念设计和详细设计,将 GTC 集成到航站楼的行李网络,以及规划未来与卫星航站楼的连接。.
The new BHS is a fully automated, ICS-based system. In compliance with Chinese customs regulations, domestic and international baggage is initially conveyed on separate belt lines to designated top loaders. Once loaded onto carriers, the bags can share common routing throughout the system. To enhance passenger convenience, check-in islands are provided within the GTC, which allows travelers arriving via car parks or public transport to check in their bags with ease. The design also includes provisions for hotel check-in and a city check-in unloading area.
BNP designed the main sortation system below the apron level to optimize space utilization and improve working conditions for baggage room operations. The system is designed with built-in redundancy that ensures each individual subsystem can continue operating at up to 75% of peak capacity, even in the event of a single point of failure. Additionally, direct-feed conveyor lines connect each check-in island to a make-up carousel, supporting efficient off-peak operations and providing a backup in the event of catastrophic system failure.
BNP supported the project through concept design, design development, simulation, tender drawings, and technical specifications for the new Baggage Handling System (BHS), which enable China West Airport Group to procure systems through a competitive tender process. During the construction phase, BNP provided experienced personnel to support the successful delivery and commissioning of the operational BHS.
2020
China West Airport Group
亚洲