Incheon International Airport (ICN) Phase 3 and 4 Baggage Handling System

Following the success of Phase 1 and 2 developments at Incheon International Airport, Incheon International Airport Corporation (IIAC) continued to engage BNP to design the baggage handling system (BHS) for Phase 3 and Phase 4 development.

image overlay Aerial view of a large international airport with multiple terminals, runways, and aircraft.

概述

Following the success of Phase 1 and 2 developments at Incheon International Airport, Incheon International Airport Corporation (IIAC) continued to engage BNP to design the baggage handling system (BHS) for Phase 3 and Phase 4 development. This marks a 20-year professional relationship milestone between IIAC and BNP. IIAC has been using BNP exclusively for all their baggage system consulting services since 1997.

Phase 3 and 4 Development

In Phase 3 development, BNP designed the BHS in the new Terminal 2 building and the BHS connection between the existing Concourse A and the Main Terminal Building. Phase 4 development sets out to increase handling capacity with system expansion and modifications to the Terminal 2 building that was constructed during Phase 3. The Phase 4 system was designed so that any baggage supplier can provide the system. (The scope of work requiring the original OEM to modify was limited, to keep the tender competitive.)

Services Provided

BNP’s services included demand analysis, conceptual design, detailed design, general building and services coordination, preparation of tender documents, and construction services. Once completed, the combined handling capacity of Incheon International Airport will be 106 million annual passengers.

项目详情

Phase 3 System Components

For Phase 3 the BHS comprised approximately 40 km of equipment, including four tilt tray sorters, an Individual Carrier System (ICS), an ICS-based early baggage storage system with 3,200 positions, 216 check-in positions, 22 make-up carousals, 24 laterals, ten transfer input conveyors, and ten dual feed claim devices.

In addition, baggage screening is accomplished with more than 40 customs screening/advanced technology X-ray machines and 16 computed tomography X-ray machines. The ICS, which forms the backbone of the baggage handling system, also connects the new Terminal 2 to the existing Concourse A and Main Terminal Building.

Phase 4 Expansion

In Phase 4, the expansion of the BHS included four final tilt tray sorters in the newly constructed terminal piers. There were also 3,000 additional positions added into the Early Bag Storage (EBS) system, six new check-in islands, 24 new make-up carousals, 30 new laterals, eight new transfer inputs, and 10 new reclaim carousels.

During Phase 4, a dedicated transfer screening system was provided in each hemisphere, which offers additional system redundancy as well as flexibility.

项目启动

2011

客户

Incheon International Airport Corporation (IIAC)

服务范围

  • 概念设计
  • Detail Design
  • Contract Documents
  • Construction Management & Supervision

地区

亚洲

行李处理系统成功案例

image overlay New Terminal A Baggage Handling System at Newark Liberty International Airport (EWR)
行李处理系统

北美

纽瓦克自由国际机场(EWR)新 A 航站楼行李处理系统

STV 公司聘请 BNP 担任纽瓦克自由国际机场 (EWR) 新航站楼 A 的行李处理系统 (BHS) 的记录工程师。.

image overlay Atlanta-Hartsfield International Airport (ATL) L-MOD Curbside Design
行李处理系统

北美

亚特兰大-哈茨菲尔德国际机场 (ATL) L-MOD 路边设计

BNP Associates 与 HOK 合作,重新设计了东南部路边传送带和 Delta Dash 包裹处理系统,以便为作为 L-MOD 计划一部分而新增的顶篷支架腾出空间。.

image overlay Tampa International Airport (TPA) Outbound Baggage System Security Enhancement Project
行李处理系统

北美

坦帕国际机场(TPA)出港行李系统安全强化项目

BNP Associates, Inc. 受聘于希尔斯伯勒县航空管理局,负责验证现有的 30% 托运行李检查系统 (CBIS) 设计,并开发 100% 系统,包括获得 TSA 批准。.

合作出成果:从大型项目到中等规模的成功。.

在建立良好声誉的同时,我们的目标是展示我们为中型项目提供高性价比解决方案的能力,向客户传授最新技术,确保他们取得长期成功。我们优先考虑与客户建立关系,而不仅仅是客户,经常与机场规划和开发部门的小型团队密切合作,以提供卓越的成果。.