跳至内容 隐私页面
返回项目

Hong Kong International Airport (HKG) Third Runway System Baggage Handling System

To meet future air traffic growth, the Airport Authority of Hong Kong (AAHK) is undertaking a major expansion to transform Hong Kong International Airport into a Three-Runway System (3RS).

image overlay Schematic diagram of a transportation infrastructure, including TRC, MFC, T1, T2, and associated facilities.

概述

To meet future air traffic growth, the Airport Authority of Hong Kong (AAHK) is undertaking a major expansion to transform Hong Kong International Airport into a Three-Runway System (3RS). The 3RS project includes the reconfiguration of the center runway, expansion of Terminal 2 (T2), and construction of Terminal 2 Concourse (T2C). This expansion will significantly increase the airport’s annual passenger handling capacity to 120 million passengers. The new T2C provides 57 additional parking positions, and a 2.6 km long Baggage Handling System (BHS) tunnel will connect T2C with Terminal 2 on the airport island.

BHS Design Scope

AAHK engaged BNP to deliver the Reference Design of the new BHS, covering all new baggage handling system and facilities, the interconnecting baggage tunnel systems, and modifications to existing baggage facilities for integration into the expanded airport-wide BHS.

System Capabilities

The new T2C BHS handles transfer bag input and screening, departure bag sortation and make-up, as well as arrivals bag offloading. Meanwhile, the T2 BHS provides check-in, departure bag security screening and sortation terminating bags to arrival reclaim. The new BHS installed in T2 and T2C features Individual Carrier System (ICS) technology to provide the highest baggage tracking accuracy as well as high-speed transportation between terminals. In addition to linking T2 and T2C, the T2 BHS serves as a hub to interconnect with the Sky Pier baggage hall and Terminal 1 baggage hall via ICS and belt conveyor systems. Security screening for both check-in and transfer bags employs ICS in-carrier hold baggage screening (HBS), ensuring precise tracking of the security status of each bag.

Resilience and Performance

To meet AAHK’s stringent resilience requirements, BNP’s design ensures that each individual BHS subsystem can handle 75% of peak baggage flow under a single failure scenario. A comprehensive real-time 3D simulation model covering Terminal 1, Terminal 2, T2C, and Sky Pier was developed and analyzed to verify that the system meets all capacity, process time, and performance requirements.

Services Provided

BNP’s scope of services includes reference design, simulation, design development, and preparation of tender drawings and specifications to support AAHK in procuring the BHS through a competitive tendering process. BNP is also providing site-based support staff during construction to assist AAHK in project delivery.

项目启动

2015

客户

Airport Authority Hong Kong

服务范围

  • 设计开发
  • 模拟
  • Contract Documents
  • Tender Review
  • Construction Stage Support

地区

亚洲

行李处理系统成功案例

image overlay New Terminal A Baggage Handling System at Newark Liberty International Airport (EWR)
行李处理系统

北美

纽瓦克自由国际机场(EWR)新 A 航站楼行李处理系统

STV 公司聘请 BNP 担任纽瓦克自由国际机场 (EWR) 新航站楼 A 的行李处理系统 (BHS) 的记录工程师。.

image overlay Atlanta-Hartsfield International Airport (ATL) L-MOD Curbside Design
行李处理系统

北美

亚特兰大-哈茨菲尔德国际机场 (ATL) L-MOD 路边设计

BNP Associates 与 HOK 合作,重新设计了东南部路边传送带和 Delta Dash 包裹处理系统,以便为作为 L-MOD 计划一部分而新增的顶篷支架腾出空间。.

image overlay Tampa International Airport (TPA) Outbound Baggage System Security Enhancement Project
行李处理系统

北美

坦帕国际机场(TPA)出港行李系统安全强化项目

BNP Associates, Inc. 受聘于希尔斯伯勒县航空管理局,负责验证现有的 30% 托运行李检查系统 (CBIS) 设计,并开发 100% 系统,包括获得 TSA 批准。.

合作出成果:从大型项目到中等规模的成功。.

在建立良好声誉的同时,我们的目标是展示我们为中型项目提供高性价比解决方案的能力,向客户传授最新技术,确保他们取得长期成功。我们优先考虑与客户建立关系,而不仅仅是客户,经常与机场规划和开发部门的小型团队密切合作,以提供卓越的成果。.

索取信息 查看项目

BNP Associates, Inc. 是为航空运输和物流业提供专业咨询服务的全球领先企业。. 

© 2025 BNP Associates, INC. 保留所有权利