跳至内容 隐私页面
返回项目

George Bush Intercontinental Airport (IAH) Terminal B Transformation

In 2023, United Airlines and the Houston Airport System selected PGAL as the Prime Consultant and Architect of Record to design the new Terminal B facility at George Bush Intercontinental Airport (IAH).

image overlay Aerial view of a busy airport with numerous commercial airplanes on the tarmac and terminal buildings.

概述

In 2023, United Airlines and the Houston Airport System selected PGAL as the Prime Consultant and Architect of Record to design the new Terminal B facility at George Bush Intercontinental Airport (IAH). PGAL has partnered with BNP Associates to provide specialized design services related to apron systems and aircraft gate equipment.

The Terminal B North/South Transformation project aims to modernize the terminal, originally opened in 1969, to enhance operational efficiency and the passenger experience. Once complete in 2026, the terminal is projected to serve up to 36 million passengers annually.

PGAL is responsible for the overall architectural design, while BNP leads the design of apron systems, passenger boarding bridges, and aircraft parking configurations.

The transformation of Terminal B, led by United Airlines in partnership with the City of Houston and Houston Airports, will modernize the original terminal and significantly improve passenger experience and operational performance.

项目详情

Design Process Phases

The design process is structured into the following phases:

  • 概念设计
  • Preliminary Design
  • Design Development – including multiple phasing designs
  • 投标文件
  • 施工管理

BNP’s Design Scope

BNP’s scope of services for design includes:

  • Passenger boarding bridges (dual and single bridge gates)
  • 400 Hz Ground Power Units
  • Preconditioned Air Units
  • Advanced Visual Display Guidance Systems
  • Aircraft parking layouts (Regional Express / Narrowbody / Widebody)
  • Ground service parking designs

Construction Administration Services

BNP Associates will also provide construction administration services to ensure compliance with design and performance requirements, including:

  • RFI and submittal reviews
  • BNP-witnessed contractor commissioning
  • Owner representative, substantial completion commissioning
  • Aircraft fit tests – multiple aircraft per gate

Project Completion

Upon completion in 2026, the revamped terminal is expected to process 36 million passengers annually. The final product will include:

  • At least 24 new gates on the north concourse
  • 16 new gates on the south concourse
  • Modifications to 3 existing adjacent C gates
  • Modified taxi lanes

项目启动

2023

客户

Houston Airport System

服务范围

  • 分析研究
  • 概念设计
  • Schematic Design
  • 设计开发
  • Phasing/Temporary Design
  • 投标文件
  • 施工管理
  • Testing & Commissioning

地区

北美

Apron Systems Success Stories

image overlay North Platte Regional Airport (LBF) Terminal Expansion Project
围裙系统

北美

北普拉特地区机场(LBF)航站楼扩建项目

内布拉斯加州北普拉特新地区机场(LBF)航站楼扩建项目旨在振兴基础设施并提高运营效率。.

image overlay Columbia Metropolitan Airport (CAE) Passenger Boarding Bridge Improvements – Phase 2
围裙系统

北美

哥伦比亚大都会机场(CAE)旅客登机桥改善工程--第二阶段

2024 年,里奇兰莱克星顿机场区选择完成其旅客登机桥 (PBB) 改善项目的第二阶段。.

image overlay Des Moines International Airport (DSM) Passenger Boarding Bridge Replacement Project
围裙系统

北美

得梅因国际机场(DSM)旅客登机桥更换项目

Foth Infrastructure & Environment 聘请 BNP 负责得梅因客运登机桥更换项目的设计和施工管理。.

合作出成果:从大型项目到中等规模的成功。.

在建立良好声誉的同时,我们的目标是展示我们为中型项目提供高性价比解决方案的能力,向客户传授最新技术,确保他们取得长期成功。我们优先考虑与客户建立关系,而不仅仅是客户,经常与机场规划和开发部门的小型团队密切合作,以提供卓越的成果。.

索取信息 查看项目

BNP Associates, Inc. 是为航空运输和物流业提供专业咨询服务的全球领先企业。. 

© 2025 BNP Associates, INC. 保留所有权利