合作出成果:从大型项目到中等规模的成功。.
在建立良好声誉的同时,我们的目标是展示我们为中型项目提供高性价比解决方案的能力,向客户传授最新技术,确保他们取得长期成功。我们优先考虑与客户建立关系,而不仅仅是客户,经常与机场规划和开发部门的小型团队密切合作,以提供卓越的成果。.
Etihad Airport Services Cargo (EASC) retained BNP to provide data analysis, design, simulation, engineering, tendering, and construction support for a new air cargo terminal (EMCT) and a forward cargo staging facility.
Etihad Airport Services Cargo (EASC) retained BNP to provide data analysis, design, simulation, engineering, tendering, and construction support for a new air cargo terminal (EMCT) and a forward cargo staging facility.
The main cargo terminal will handle 1 million tons of cargo per year and cover 70,000 square meters. A smaller fully airside forward transfer facility, covering 6,500 square meters and handling 250,000 tons per year, will support high transit volumes and help reduce pressure on the main cargo terminal.
BNP work began with the development of a high-level concept of operations, conceptual building and system design, and an in-depth analysis of existing processes and data, down to each AirWayBill. The initial concepts were evaluated, and a preferred concept was selected for further development with an architect/engineer (ADPi/Meinhardt) that the airport separately retained.
The design was reviewed with the stakeholders and coordinated with the architect/engineer in 3D using BIM.
BNP supported EASC with the tendering of the MHS and evaluation/selection of the supplier.
The project is currently under construction, with the MHS being provided by Lodige Industries. The EMCT cargo handling system features a ULD storage system comprising 34 dolly interface points and four elevating transfer vehicles, which service 1000 ULD storage positions.
The design incorporates:
The Forward Transfer Facility Cargo Handling System features a ULD Storage System consisting of the following:
2023
Etihad Airport Services Cargo
中东