合作出成果:从大型项目到中等规模的成功。.
在建立良好声誉的同时,我们的目标是展示我们为中型项目提供高性价比解决方案的能力,向客户传授最新技术,确保他们取得长期成功。我们优先考虑与客户建立关系,而不仅仅是客户,经常与机场规划和开发部门的小型团队密切合作,以提供卓越的成果。.
MNG Airlines engaged BNP for a feasibility study to develop two facilities for E-commerce and warehousing.
MNG Airlines engaged BNP for a feasibility study to develop two facilities for E-commerce and warehousing.
For the e-commerce facility, several options were evaluated based on the available plots of land, the potential reuse or modification of existing facilities, and the level of automation. An exciting challenge in this project is the significant elevation difference (~7 meters) across the plot, the split lots, and existing substantial utilities. Management briefs evaluating the options were provided, including high-level cost estimates.
The proposed technology consisted of a stacked set of cross-belt sortation systems that sorted items to chutes connecting to trolleys. The trolleys feature a flexible bottom that lowers as weight is added, thus reducing the drop distance from the chute into the trolley. The trolleys can be manually moved around, towed with a small tractor, or handled by automated guided vehicles (AGVs) in the future. The capacity is 15,000 items per hour to 100 chutes/destinations.
For the airside free zone warehouse, the lot was fixed. Still, there was uncertainty about the potential business that required a high degree of flexibility to transition from a low-cost, manual operation to a high-throughput, automated process without significant operational disruption. The ultimate capacity when maximizing the site and automation is 37,000 pallet positions.
The warehouse includes security and customs functions for incidental use. It has direct airside access with ULD break and builds positions to enable quick response time from order to fulfillment.
2019
MNG Airlines, Istanbul International Airport (IST)
中东