合作出成果:从大型项目到中等规模的成功。.
在建立良好声誉的同时,我们的目标是展示我们为中型项目提供高性价比解决方案的能力,向客户传授最新技术,确保他们取得长期成功。我们优先考虑与客户建立关系,而不仅仅是客户,经常与机场规划和开发部门的小型团队密切合作,以提供卓越的成果。.
In 2024, the Richland Lexington Airport District chose to complete the second phase of its Passenger Boarding Bridge (PBB) Improvement Project. Foth Infrastructure Solutions has retained BNP Associates, Inc. and Miller Dunwiddie Architecture for design and construction administration services.
This phase of the project will include the replacement of two existing tele-radial PBBs with new mechanical/electrical apron drive PBBs. It will also include the addition of another new PBB (a total of three) to convert an existing gate from ground loading of passengers to a PBB loading process.
The design scope stages followed the standard format:
In addition to the three new PBBs, this project will include:
We are also strongly considering upgrading the existing PBB operator control consoles with:
Construction Administration Services will include:
2024
Richland Lexington Airport District
北美