跳至内容 隐私页面
返回项目

哥伦比亚大都会机场(CAE)旅客登机桥改善工程--第二阶段

2024 年,里奇兰莱克星顿机场区选择完成其旅客登机桥 (PBB) 改善项目的第二阶段。.

image overlay Aerial diagram of an aircraft with measurements and layout details.

概述

In 2024, the Richland Lexington Airport District chose to complete the second phase of its Passenger Boarding Bridge (PBB) Improvement Project. Foth Infrastructure Solutions has retained BNP Associates, Inc. and Miller Dunwiddie Architecture for design and construction administration services.

This phase of the project will include the replacement of two existing tele-radial PBBs with new mechanical/electrical apron drive PBBs. It will also include the addition of another new PBB (a total of three) to convert an existing gate from ground loading of passengers to a PBB loading process.

项目详情

Design Scope

The design scope stages followed the standard format:

  • 概念设计
  • Preliminary Design
  • 设计开发
  • Tender Stage

Project Components

In addition to the three new PBBs, this project will include:

  • One new fixed walkway
  • Refurbishment of two existing walkways
  • New 400 Hz ground power units and cable hoists at all new PBBs
  • One new Pre-Conditioned Air (PCA) unit with hoses
  • Relocation of two existing PCA units to the new PBBs
  • Rooftop air conditioning/heating units for all three new PBBs
  • A new motorized bag lift in the new walkway
  • New potable water cabinets

Control System Upgrades

We are also strongly considering upgrading the existing PBB operator control consoles with:

  • New PLC-controlled operator consoles and screens to match the new PBBs
  • Wireless 5G network interface to monitor fleet and gate management, as well as the status of the PBBs, 400 Hz power units, and PC air equipment. This information would be accessible to operators via cell phones, tablets, or computer workstations.

Construction Administration Services

Construction Administration Services will include:

  • Submittal reviews
  • Onsite PBB and equipment physical inspections
  • BNP-witnessed contractor commissioning
  • Owner representative substantial completion commissioning
  • Aircraft fit tests where stop marks were revised or are new

项目启动

2024

客户

Richland Lexington Airport District

服务范围

  • 概念设计
  • 设计开发
  • 投标文件
  • 施工管理
  • Testing & Commissioning

地区

北美

Apron Systems Success Stories

image overlay North Platte Regional Airport (LBF) Terminal Expansion Project
围裙系统

北美

北普拉特地区机场(LBF)航站楼扩建项目

内布拉斯加州北普拉特新地区机场(LBF)航站楼扩建项目旨在振兴基础设施并提高运营效率。.

image overlay Des Moines International Airport (DSM) Passenger Boarding Bridge Replacement Project
围裙系统

北美

得梅因国际机场(DSM)旅客登机桥更换项目

Foth Infrastructure & Environment 聘请 BNP 负责得梅因客运登机桥更换项目的设计和施工管理。.

image overlay George Bush Intercontinental Airport (IAH) Terminal B Transformation
围裙系统

北美

George Bush Intercontinental Airport (IAH) Terminal B Transformation

In 2023, United Airlines and the Houston Airport System selected PGAL as the Prime Consultant and Architect of Record to design the new Terminal B facility at George Bush Intercontinental Airport (IAH).

合作出成果:从大型项目到中等规模的成功。.

在建立良好声誉的同时,我们的目标是展示我们为中型项目提供高性价比解决方案的能力,向客户传授最新技术,确保他们取得长期成功。我们优先考虑与客户建立关系,而不仅仅是客户,经常与机场规划和开发部门的小型团队密切合作,以提供卓越的成果。.

索取信息 查看项目

BNP Associates, Inc. 是为航空运输和物流业提供专业咨询服务的全球领先企业。. 

© 2025 BNP Associates, INC. 保留所有权利