合作出成果:从大型项目到中等规模的成功。.
在建立良好声誉的同时,我们的目标是展示我们为中型项目提供高性价比解决方案的能力,向客户传授最新技术,确保他们取得长期成功。我们优先考虑与客户建立关系,而不仅仅是客户,经常与机场规划和开发部门的小型团队密切合作,以提供卓越的成果。.
MATAR 已聘请 BNP 和中东领先的 A&E 公司 Dar Al-Handasah,负责新航空货运站(2 号航站楼)的设计、工程、招标和施工管理服务。.
MATAR has retained BNP and the leading Middle East A&E firm Dar Al-Handasah for the design, engineering, tendering, and construction administration services for a new air cargo terminal (Terminal 2). At 3.3 million tons per annum, DOH will rank in the top 3 cargo terminals in the world for capacity.
E-commerce and related courier delivery flows represent a significant growth area in air cargo. As part of this project, an automated mail and courier handling system is being developed to provide the following functions:
The system has three entry points where items are automatically identified, then moved by conveyors through screening machines to a cross-belt sorter and collection chutes. Items are stored individually by placing them in carriers, which are kept in an Automated Storage and Retrieval System that releases carriers when needed.
The system is designed with a single main sorting loop, but can be expanded to include a second sorter and additional chutes later to handle more items or provide backup. It can process up to 2,700 items per hour (limited by screening), with storage space for about 1,000 items.
The mail and courier system also uses the airport’s large ULD handling system to store and move unit load devices between the ground floor and the second-floor mail and courier area.
2021
MATAR, Hamad International Airport (DOH)
中东