跳至内容 隐私页面
返回项目

Cargo Mega Terminal Upgrade & Expansion at Dubai International Airport (DXB)

德黑兰国际机场现有的大型货运站已接近饱和,自动化程度较低。BNP 受聘对之前的分析结果进行审查、汇编和验证。.

image overlay Aerial view of a large commercial airport terminal with text Share a smile in 120 languages displayed on the building facade.

概述

The existing Cargo Mega Terminal at DXB was nearing capacity and had a low level of automation. BNP was retained to review, compile, and validate the previous analysis results. This required validating the storage master plan, ULD storage staging, as well as the upgrade and expansion requirements for both current and new modules.

Project Scope

Scope of work included the upgrade and expansion of the existing Cargo Mega Terminal (CMT) at Dubai International Airport, increasing the cargo handling capacity of the existing 4 modules to handle the EK Passenger Aircrafts Belly Cargo for an additional 100,000 tons p.a., and upgrading the ASRS inline screening for transit shipments according to the new EU Security Regulation and TSA.

Another module was developed with an additional 300,00 tons p.a. for Emirates Sky Cargo by connecting the older modules and providing a West Cross Dock handling system and a new PCHS bridge connecting Freight Gate 1 with Module E. All these expansions were interconnected with one another physically and digitally, in order to allow system crossover.

Analysis and Design Solution

BNP analyzed and mapped the current operations at the CMT to recommend upgrades and expansions that align with the latest flight schedule. Several design options were explored, and the chosen solution involved upgrading a large part of the existing facility and adding a new Module I. This module connects to Freight Gate 1 and the West Cross Dock via the FG1-Module E bridge, allowing full integration with the mail, perishables, pharmaceuticals, pallet, and cargo systems.

System Components

The system upgrades and expansions contained the following key pieces of equipment:

  • General material handling conveyance (right angle decks, straight roller decks, storage, ball matting, truck docking system)
  • ULD and pallet hoists
  • Horizontal and elevating transfer vehicles (ULDS) and T-Cars (Pallets)
  • Automated Storage & Retrieval Systems
  • Fire shutters
  • Cold Storage Solutions

Implementation Support

BNP also assisted in preparing contract documents (including specifications) and evaluating suppliers during the bidding and procurement stages. During execution, BNP performed all site supervision activities including installation, testing, commissioning, handover, and closeout.

项目启动

2015

客户

Dubai Airports Company

服务范围

  • Feasibility Study
  • 概念设计
  • 设计开发
  • Contract Documents
  • Bidding & Procurement
  • Construction Monitoring

地区

中东

Cargo Solutions Success Stories

image overlay Cargo Terminal 2 Mail and Courier Handling at Hamad International Airport (DOH)
货运解决方案

中东

哈马德国际机场 2 号货运航站楼的邮件和快递处理 (DOH)

MATAR 已聘请 BNP 和中东领先的 A&E 公司 Dar Al-Handasah,负责新航空货运站(2 号航站楼)的设计、工程、招标和施工管理服务。.

image overlay Technical Feasibility Study of the MHS for the Redevelopment of the Hongkong Post Air Mail Center
货运解决方案

亚洲

香港邮政空邮中心重建项目的技术可行性研究

香港邮政将重建香港国际机场现有的航空邮件中心,BNP 受聘为重建可行性研究提供咨询服务。.

image overlay Postal Automation Design Services at the Northern Taiwan Mail Processing Center
货运解决方案

亚洲

Postal Automation Design Services at the Northern Taiwan Mail Processing Center

In 2017, BNP partnered with the local consultancy firm Sinotech to provide postal automation design services for the Northern Taiwan Mail Processing Center.

合作出成果:从大型项目到中等规模的成功。.

在建立良好声誉的同时,我们的目标是展示我们为中型项目提供高性价比解决方案的能力,向客户传授最新技术,确保他们取得长期成功。我们优先考虑与客户建立关系,而不仅仅是客户,经常与机场规划和开发部门的小型团队密切合作,以提供卓越的成果。.

索取信息 查看项目

BNP Associates, Inc. 是为航空运输和物流业提供专业咨询服务的全球领先企业。. 

© 2025 BNP Associates, INC. 保留所有权利