史基浦国际机场(AMS)A 航站楼行李处理系统

KAAN 建筑事务所聘请 BNP 作为建筑和工程联合体的一部分,负责设计阿姆斯特丹史基浦国际机场的新 A 航站楼。.

image overlay Complex circuit board with intricate metallic patterns and traces against a dark background.

概述

KAAN Architects retained BNP as part of an architecture and engineering consortium to design the new Terminal A at Schiphol International Airport in Amsterdam. BNP is responsible for designing the baggage handling system, which will function as an extension of the existing South Bag Hall, sharing logistics and capacity between the two systems. The terminal is designed to accommodate 24 million passengers per year.

Flexible Design Requirements

The design needed to allow for an easy switch between origin-destination (OD) and hub-based operations. This required a flexible system that could support two different flight schedules. BNP conducted a detailed numerical analysis to identify the key requirements for the new baggage system.

Demand Analysis and Optimization

The findings were used to define baggage demand and inform a multidisciplinary concept study that validated the terminal’s shape and size. Due to the system’s flexible design, the new terminal can share the large Early Bag Store (EBS) that is part of the South Bag Hall system. This reduces the footprint needed for the building if the OD scenario is selected.

Innovative Solutions

Limited space and strong health and safety requirements from the stakeholders also led to the use of batch-processing technologies in the new terminal. Batching stations, using semi-automated loading, helped reduce the number of make-up positions while maintaining high make-up capacity.

Technology Implementation

BNP applied new technologies and processes to meet the high transfer, EBS, and make-up demands of Hub operations. Additionally, a strong interface with the existing bag halls was essential so both systems could work together for Hub operations or separately for OD, depending on the chosen mode.

System Validation

To demonstrate that the system could handle the expected demand, BNP created a comprehensive 3D simulation of the proposed system. This included the existing South Bag Hall, the rack-based EBS, and the new batching process.

项目启动

2018

客户

Schiphol Group

服务范围

  • 分析研究
  • 概念设计
  • 设计开发
  • System Simulation

地区

欧洲

行李处理系统成功案例

image overlay TSA Recapitalization and BHS Modernization at Denver International Airport (DEN)
行李处理系统

北美

TSA Recapitalization and BHS Modernization at Denver International Airport (DEN)

As an essential member of the PCL Construction Design-Build (DB) team, Studdiford Technical Solutions, LLC (STS) provides BHS subject matter expertise for the TSA Recapitalization and Baggage Handling System (BHS) Modernization program.

image overlay Orlando International Airport (MCO) South Terminal C Project
行李处理系统

北美

Orlando International Airport (MCO) South Terminal C Project

As a member of the BHS design‑build team, Studdiford Technical Solutions, LLC (STS) provided BHS subject matter expertise, design oversight, system integration support, and commissioning services for the South Terminal.

image overlay Terminal 2 BHS DeviceNet Replacement at Oakland San Francisco Bay Airport (OAK)
行李处理系统

北美

Terminal 2 BHS DeviceNet Replacement at Oakland San Francisco Bay Airport (OAK)

Studdiford Technical Solutions, LLC (STS) managed the modernization of the Terminal 2 baggage handling system through controls upgrades, commissioning, and implementation oversight.

合作出成果:从大型项目到中等规模的成功。.

在建立良好声誉的同时,我们的目标是展示我们为中型项目提供高性价比解决方案的能力,向客户传授最新技术,确保他们取得长期成功。我们优先考虑与客户建立关系,而不仅仅是客户,经常与机场规划和开发部门的小型团队密切合作,以提供卓越的成果。.

索取信息 查看项目