O'Hare 21 Terminal Area Plan Program at O'Hare International Airport (ORD)

Studdiford Technical Solutions, LLC (STS) provides BHS subject matter expertise across all facets of the ORDNext program, supporting design coordination, TSA compliance, procurement strategy, and commissioning across new and redeveloped terminal facilities.

image overlay O’Hare 21 Terminal Area Plan Program at O’Hare International Airport (ORD)

Visão geral

The O’Hare 21 Terminal Area Plan (ORDNext) is a multi‑year airport modernization program at O’Hare International Airport that includes new terminal development, redevelopment of existing facilities, and comprehensive modernization of baggage handling systems. The program integrates new and upgraded BHS infrastructure across multiple terminals to support expanded capacity, improved operations, and long‑term growth.

Project Details

The ORDNext Baggage Handling System (BHS) program is being developed in parallel with extensive facility modernization efforts, including construction of new terminals and redevelopment of existing facilities. The scope includes replacement of the legacy Terminal 5 BHS, featuring a new Checked Baggage Inspection System (CBIS), new Early Bag Storage (EBS), and a new outbound make‑up bagroom.

Beyond Terminal 5, the ORDNext BHS program includes modifications and upgrades to the existing baggage handling systems in Terminals 1, 2, and 3. The program also encompasses development of the new O’Hare Global Terminal (OGT), which includes a new CBIS, new EBS, a new outbound make‑up bagroom, and a terminating inbound baggage system. Two new satellite concourses are being constructed to support additional gates, including a new make‑up bagroom within Satellite 1. The satellite concourses are connected to the OGT through a consolidated tunnel containing both BHS connections and a tug roadway.

As a critical member of the Connect Chicago Alliance (CCA) Project Management Office (PMO) team, Studdiford Technical Solutions, LLC (STS) provides BHS subject matter expertise across all facets of the ORDNext program. For the Terminal 5 BHS replacement, STS supports design and construction documentation reviews, provides technical recommendations for BHS RFIs, coordinates TSA Requests for Variance (RFVs) and Configuration Change Requests (CCRs), and leads on‑site commissioning and testing activities. Commissioning services include static mechanical and electrical testing, dynamic and functional testing, and TSA compliance commissioning.

For the broader ORDNext program, STS leads early design coordination efforts, providing procurement methodology recommendations to the Chicago Department of Aviation (CDA), coordinating directly with airlines on potential supplemental BHS projects beyond the current ORDNext scope, and working with designers on design development and budget updates. STS will continue providing the same level of BHS expertise throughout the program as delivered for the Terminal 5 BHS replacement.

The overall scope of services includes oversight of all BHS and CBIS design for TSA compliance, monitoring designer and contractor performance, providing technology recommendations, advising on procurement strategies for both capital expenditures and operations and maintenance, ORAT support, and oversight of bid package development.

Início do projeto

N/A

Cliente

Connect Chicago Alliance; Chicago Department of Aviation

Âmbito do serviço

No scope of service information available.

Região

América do Norte

Histórias de sucesso de sistemas de manuseamento de bagagens

image overlay TSA Recapitalization and BHS Modernization at Denver International Airport (DEN)
Sistemas de manuseamento de bagagens

América do Norte

TSA Recapitalization and BHS Modernization at Denver International Airport (DEN)

As an essential member of the PCL Construction Design-Build (DB) team, Studdiford Technical Solutions, LLC (STS) provides BHS subject matter expertise for the TSA Recapitalization and Baggage Handling System (BHS) Modernization program.

image overlay Orlando International Airport (MCO) South Terminal C Project
Sistemas de manuseamento de bagagens

América do Norte

Orlando International Airport (MCO) South Terminal C Project

As a member of the BHS design‑build team, Studdiford Technical Solutions, LLC (STS) provided BHS subject matter expertise, design oversight, system integration support, and commissioning services for the South Terminal.

image overlay Terminal 2 BHS DeviceNet Replacement at Oakland San Francisco Bay Airport (OAK)
Sistemas de manuseamento de bagagens

América do Norte

Terminal 2 BHS DeviceNet Replacement at Oakland San Francisco Bay Airport (OAK)

Studdiford Technical Solutions, LLC (STS) managed the modernization of the Terminal 2 baggage handling system through controls upgrades, commissioning, and implementation oversight.

Parceria para resultados: De Mega-Projectos a Sucesso de Média Dimensão.

Ao mesmo tempo que construímos a nossa forte reputação, pretendemos mostrar a nossa capacidade de fornecer soluções rentáveis para projectos de média dimensão, educando os clientes sobre as mais recentes tecnologias e garantindo o seu sucesso a longo prazo. Damos prioridade à construção de relações com os clientes, e não apenas com os clientes, trabalhando frequentemente em estreita colaboração com pequenas equipas nos departamentos de planeamento e desenvolvimento dos aeroportos para obter resultados excepcionais.

Pedir informações Ver projectos

A BNP Associates, Inc. é líder mundial no fornecimento de serviços de consultoria especializados para os sectores do transporte aéreo e da logística. 

© 2025 BNP Associates, INC. todos os direitos reservados