Saltar para o conteúdo Página de privacidade
Voltar a Projectos

East Midfield Cargo Terminal and Forward Transfer Facility at Abu Dhabi International Airport (AUH)

Etihad Airport Services Cargo (EASC) retained BNP to provide data analysis, design, simulation, engineering, tendering, and construction support for a new air cargo terminal (EMCT) and a forward cargo staging facility.

image overlay Large cargo shipping terminal with containers, cranes, and cityscape.

Visão geral

Etihad Airport Services Cargo (EASC) retained BNP to provide data analysis, design, simulation, engineering, tendering, and construction support for a new air cargo terminal (EMCT) and a forward cargo staging facility.

The main cargo terminal will handle 1 million tons of cargo per year and cover 70,000 square meters. A smaller fully airside forward transfer facility, covering 6,500 square meters and handling 250,000 tons per year, will support high transit volumes and help reduce pressure on the main cargo terminal.

Project Development

BNP work began with the development of a high-level concept of operations, conceptual building and system design, and an in-depth analysis of existing processes and data, down to each AirWayBill. The initial concepts were evaluated, and a preferred concept was selected for further development with an architect/engineer (ADPi/Meinhardt) that the airport separately retained.

The design was reviewed with the stakeholders and coordinated with the architect/engineer in 3D using BIM.

Tender Support and Construction

BNP supported EASC with the tendering of the MHS and evaluation/selection of the supplier.

The project is currently under construction, with the MHS being provided by Lodige Industries. The EMCT cargo handling system features a ULD storage system comprising 34 dolly interface points and four elevating transfer vehicles, which service 1000 ULD storage positions.

DETALHES DO PROJECTO

Main Cargo Terminal Design

The design incorporates:

  • 34 Dolly interface points
  • 4 Elevating Transfer Vehicles
  • 1000 ULD storage positions
  • 32 Lowerable Workstations featuring Automated Guided Vehicle distribution.
  • 41 Truck docks equipped with dock levelers and scissor lifts to cater to a wide fleet mix, including roller trucks.
  • 5,500 Consignment Storage Positions: 2 modules of Automated Storage and Retrieval Systems (ASRS), each containing 2,750 In-House-Pallet storage positions and 8 ASRS Cranes.
  • The facility features a comprehensive end-to-end cool chain system that includes eight insulated dolly interfaces, 12 insulated truck docks—segregated for perishables (PER) and pharmaceuticals (PIL)—and two insulated scissor lifts for handling temperature-sensitive ULDs. It offers more than 1,000 pallet positions with humidity and temperature control across COL, CRT, and FRO ranges. Additionally, the system includes 80 cool ULD storage cells. For cargo processing, 16 workstations are distributed across four areas, dedicated to handling PER and PIL cargo at COL and CRT temperature levels.
  • The dedicated mail sorting area includes a cross-belt sorter and 21 chutes for handling mail bags.

Forward Transfer Facility

The Forward Transfer Facility Cargo Handling System features a ULD Storage System consisting of the following:

  • 17 dolly interface points, eight fully enclosed to accommodate the handling of COL and CRT ULDs.
  • 4 ETVs servicing 600 ULD positions, of which 80 are temperature-controlled for storing COL and CRT Cargo.
  • Integrated ULD Screening Capability.

Início do projeto

2023

Cliente

Etihad Airport Services Cargo

Âmbito do serviço

  • Estudo de análise
  • Conceção concetual
  • Desenvolvimento de design
  • 3D Simulation
  • Documentação da proposta
  • Tender Support
  • Administração da construção
  • Testes e colocação em funcionamento

Região

Médio Oriente

Histórias de sucesso de soluções de carga

image overlay Cargo Terminal 2 Mail and Courier Handling at Hamad International Airport (DOH)
Soluções de carga

Médio Oriente

Terminal de Carga 2 - Tratamento de correio e correio expresso no Aeroporto Internacional de Hamad (DOH)

A MATAR contratou o BNP e a Dar Al-Handasah, empresa líder em A&E no Médio Oriente, para a conceção, engenharia, concurso e serviços de administração da construção de um novo terminal de carga aérea (Terminal 2).

image overlay Cargo Mega Terminal Upgrade & Expansion at Dubai International Airport (DXB)
Soluções de carga

Médio Oriente

Melhoria e expansão do mega terminal de carga no Aeroporto Internacional do Dubai (DXB)

O Cargo Mega Terminal existente em DXB estava a aproximar-se da capacidade e tinha um baixo nível de automatização. A BNP foi contratada para rever, compilar e validar os resultados da análise anterior.

image overlay Technical Feasibility Study of the MHS for the Redevelopment of the Hongkong Post Air Mail Center
Soluções de carga

Ásia

Estudo de viabilidade técnica do MHS para a remodelação do Centro de Correio Aéreo dos Correios de Hong Kong

Os Correios de Hong Kong vão remodelar o atual Centro de Correio Aéreo do Aeroporto Internacional de Hong Kong, e o BNP foi contratado para prestar serviços de consultoria para um estudo de viabilidade de remodelação.

Parceria para resultados: De Mega-Projectos a Sucesso de Média Dimensão.

Ao mesmo tempo que construímos a nossa forte reputação, pretendemos mostrar a nossa capacidade de fornecer soluções rentáveis para projectos de média dimensão, educando os clientes sobre as mais recentes tecnologias e garantindo o seu sucesso a longo prazo. Damos prioridade à construção de relações com os clientes, e não apenas com os clientes, trabalhando frequentemente em estreita colaboração com pequenas equipas nos departamentos de planeamento e desenvolvimento dos aeroportos para obter resultados excepcionais.

Pedir informações Ver projectos

A BNP Associates, Inc. é líder mundial no fornecimento de serviços de consultoria especializados para os sectores do transporte aéreo e da logística. 

© 2025 BNP Associates, INC. todos os direitos reservados