Cargo Terminal 2 Analysis and Design Simulation at Hamad International Airport, Qatar (DOH)

MATAR engaged BNP and Middle East architecture and engineering firm Dar Al-Handasah to deliver data analysis and simulation for a new multi-level air cargo terminal (Terminal 2).

image overlay Abstract 3D city model with various geometric shapes and structures.

Visão geral

MATAR engaged BNP and Middle East architecture and engineering firm Dar Al-Handasah to deliver data analysis and simulation for a new multi-level air cargo terminal (Terminal 2).

Analysis and Simulation Development

The analysis included the development of the 3D simulation and cargo flow model for Hamad International Airport, which began with an extensive analysis of existing cargo records. This analysis generated detailed forecasts for each product category. These forecasts were then used to predict cargo demand for peak days and peak hours, providing a solid foundation for the facility’s design and subsequent simulation evaluation.

Facility Design

Once the design was finalized, a simulation model was developed for the 8-level air cargo processing and sorting center. The center features an automated material handling system capable of processing 4.5 million tons of cargo annually.

Áreas funcionais

Functional areas modeled include landside delivery acceptance, security screening, consignment binning, ASRS bin storage, automated ULD storage, ULD build and break workstations, cool storage, and ULD airside interfaces.

Início do projeto

2021

Cliente

MATAR

Âmbito do serviço

  • Análise de dados
  • Simulação MHS

Região

Médio Oriente

Histórias de sucesso de simulação

image overlay Changi International Airport (SIN) Terminal 5 Baggage Handling Systems
Sistemas de manuseamento de bagagens

Ásia

Sistemas de manuseamento de bagagens do Terminal 5 do Aeroporto Internacional de Changi (SIN)

O BNP foi contratado pelo Changi Airport Group (CAG) para prestar serviços de consultoria para o novo Sistema de Tratamento de Bagagens (BHS) no novo Terminal 5, no âmbito dos planos de expansão do Aeroporto Internacional de Changi.

image overlay Xi’an Xianyang International Airport (XIY) New Terminal 5 Baggage Handling System
Sistemas de manuseamento de bagagens

Ásia

Sistema de manuseamento de bagagens do novo Terminal 5 do Aeroporto Internacional de Xi'an Xianyang (XIY)

A BNP foi contratada para projetar o Sistema de Tratamento de Bagagens (BHS) para o novo terminal. Este âmbito inclui o desenvolvimento de projectos conceptuais e detalhados para todos os sistemas de bagagens, a integração do GTC na rede de bagagens do terminal e o planeamento da futura conetividade a um terminal satélite.

image overlay Schiphol International Airport (AMS) Terminal A Baggage Handling System
Sistemas de manuseamento de bagagens

Europa

Sistema de manuseamento de bagagens do Terminal A do Aeroporto Internacional de Schiphol (AMS)

A KAAN Architects contratou o BNP como parte de um consórcio de arquitetura e engenharia para projetar o novo Terminal A do Aeroporto Internacional de Schiphol, em Amesterdão.

Parceria para resultados: De Mega-Projectos a Sucesso de Média Dimensão.

Ao mesmo tempo que construímos a nossa forte reputação, pretendemos mostrar a nossa capacidade de fornecer soluções rentáveis para projectos de média dimensão, educando os clientes sobre as mais recentes tecnologias e garantindo o seu sucesso a longo prazo. Damos prioridade à construção de relações com os clientes, e não apenas com os clientes, trabalhando frequentemente em estreita colaboração com pequenas equipas nos departamentos de planeamento e desenvolvimento dos aeroportos para obter resultados excepcionais.

Pedir informações Ver projectos

A BNP Associates, Inc. é líder mundial no fornecimento de serviços de consultoria especializados para os sectores do transporte aéreo e da logística. 

© 2025 BNP Associates, INC. todos os direitos reservados