Incheon International Airport (ICN) Phase 3 and 4 Baggage Handling System

Following the success of Phase 1 and 2 developments at Incheon International Airport, Incheon International Airport Corporation (IIAC) continued to engage BNP to design the baggage handling system (BHS) for Phase 3 and Phase 4 development.

image overlay Aerial view of a large international airport with multiple terminals, runways, and aircraft.

Visão geral

Following the success of Phase 1 and 2 developments at Incheon International Airport, Incheon International Airport Corporation (IIAC) continued to engage BNP to design the baggage handling system (BHS) for Phase 3 and Phase 4 development. This marks a 20-year professional relationship milestone between IIAC and BNP. IIAC has been using BNP exclusively for all their baggage system consulting services since 1997.

Phase 3 and 4 Development

In Phase 3 development, BNP designed the BHS in the new Terminal 2 building and the BHS connection between the existing Concourse A and the Main Terminal Building. Phase 4 development sets out to increase handling capacity with system expansion and modifications to the Terminal 2 building that was constructed during Phase 3. The Phase 4 system was designed so that any baggage supplier can provide the system. (The scope of work requiring the original OEM to modify was limited, to keep the tender competitive.)

Services Provided

BNP’s services included demand analysis, conceptual design, detailed design, general building and services coordination, preparation of tender documents, and construction services. Once completed, the combined handling capacity of Incheon International Airport will be 106 million annual passengers.

DETALHES DO PROJECTO

Phase 3 System Components

For Phase 3 the BHS comprised approximately 40 km of equipment, including four tilt tray sorters, an Individual Carrier System (ICS), an ICS-based early baggage storage system with 3,200 positions, 216 check-in positions, 22 make-up carousals, 24 laterals, ten transfer input conveyors, and ten dual feed claim devices.

In addition, baggage screening is accomplished with more than 40 customs screening/advanced technology X-ray machines and 16 computed tomography X-ray machines. The ICS, which forms the backbone of the baggage handling system, also connects the new Terminal 2 to the existing Concourse A and Main Terminal Building.

Phase 4 Expansion

In Phase 4, the expansion of the BHS included four final tilt tray sorters in the newly constructed terminal piers. There were also 3,000 additional positions added into the Early Bag Storage (EBS) system, six new check-in islands, 24 new make-up carousals, 30 new laterals, eight new transfer inputs, and 10 new reclaim carousels.

During Phase 4, a dedicated transfer screening system was provided in each hemisphere, which offers additional system redundancy as well as flexibility.

Início do projeto

2011

Cliente

Incheon International Airport Corporation (IIAC)

Âmbito do serviço

  • Conceção concetual
  • Desenho de pormenor
  • Documentos do contrato
  • Construction Management & Supervision

Região

Ásia

Histórias de sucesso de sistemas de manuseamento de bagagens

image overlay TSA Recapitalization and BHS Modernization at Denver International Airport (DEN)
Sistemas de manuseamento de bagagens

América do Norte

TSA Recapitalization and BHS Modernization at Denver International Airport (DEN)

As an essential member of the PCL Construction Design-Build (DB) team, Studdiford Technical Solutions, LLC (STS) provides BHS subject matter expertise for the TSA Recapitalization and Baggage Handling System (BHS) Modernization program.

image overlay Orlando International Airport (MCO) South Terminal C Project
Sistemas de manuseamento de bagagens

América do Norte

Orlando International Airport (MCO) South Terminal C Project

As a member of the BHS design‑build team, Studdiford Technical Solutions, LLC (STS) provided BHS subject matter expertise, design oversight, system integration support, and commissioning services for the South Terminal.

image overlay Terminal 2 BHS DeviceNet Replacement at Oakland San Francisco Bay Airport (OAK)
Sistemas de manuseamento de bagagens

América do Norte

Terminal 2 BHS DeviceNet Replacement at Oakland San Francisco Bay Airport (OAK)

Studdiford Technical Solutions, LLC (STS) managed the modernization of the Terminal 2 baggage handling system through controls upgrades, commissioning, and implementation oversight.

Parceria para resultados: De Mega-Projectos a Sucesso de Média Dimensão.

Ao mesmo tempo que construímos a nossa forte reputação, pretendemos mostrar a nossa capacidade de fornecer soluções rentáveis para projectos de média dimensão, educando os clientes sobre as mais recentes tecnologias e garantindo o seu sucesso a longo prazo. Damos prioridade à construção de relações com os clientes, e não apenas com os clientes, trabalhando frequentemente em estreita colaboração com pequenas equipas nos departamentos de planeamento e desenvolvimento dos aeroportos para obter resultados excepcionais.

Pedir informações Ver projectos

A BNP Associates, Inc. é líder mundial no fornecimento de serviços de consultoria especializados para os sectores do transporte aéreo e da logística. 

© 2025 BNP Associates, INC. todos os direitos reservados