Système de traitement des bagages du terminal A de l'aéroport international de Schiphol (AMS)

KAAN Architects a retenu BNP dans le cadre d'un consortium d'architecture et d'ingénierie pour la conception du nouveau terminal A de l'aéroport international de Schiphol à Amsterdam.

image overlay Complex circuit board with intricate metallic patterns and traces against a dark background.

Vue d'ensemble

KAAN Architects retained BNP as part of an architecture and engineering consortium to design the new Terminal A at Schiphol International Airport in Amsterdam. BNP is responsible for designing the baggage handling system, which will function as an extension of the existing South Bag Hall, sharing logistics and capacity between the two systems. The terminal is designed to accommodate 24 million passengers per year.

Flexible Design Requirements

The design needed to allow for an easy switch between origin-destination (OD) and hub-based operations. This required a flexible system that could support two different flight schedules. BNP conducted a detailed numerical analysis to identify the key requirements for the new baggage system.

Demand Analysis and Optimization

The findings were used to define baggage demand and inform a multidisciplinary concept study that validated the terminal’s shape and size. Due to the system’s flexible design, the new terminal can share the large Early Bag Store (EBS) that is part of the South Bag Hall system. This reduces the footprint needed for the building if the OD scenario is selected.

Innovative Solutions

Limited space and strong health and safety requirements from the stakeholders also led to the use of batch-processing technologies in the new terminal. Batching stations, using semi-automated loading, helped reduce the number of make-up positions while maintaining high make-up capacity.

Technology Implementation

BNP applied new technologies and processes to meet the high transfer, EBS, and make-up demands of Hub operations. Additionally, a strong interface with the existing bag halls was essential so both systems could work together for Hub operations or separately for OD, depending on the chosen mode.

System Validation

To demonstrate that the system could handle the expected demand, BNP created a comprehensive 3D simulation of the proposed system. This included the existing South Bag Hall, the rack-based EBS, and the new batching process.

Début du projet

2018

Client

Schiphol Group

Étendue des services

  • Étude d'analyse
  • Design conceptuel
  • Développement de la conception
  • System Simulation

Région

L'Europe

Systèmes de manutention des bagages : histoires à succès

image overlay TSA Recapitalization and BHS Modernization at Denver International Airport (DEN)
Systèmes de traitement des bagages

Amérique du Nord

TSA Recapitalization and BHS Modernization at Denver International Airport (DEN)

As an essential member of the PCL Construction Design-Build (DB) team, Studdiford Technical Solutions, LLC (STS) provides BHS subject matter expertise for the TSA Recapitalization and Baggage Handling System (BHS) Modernization program.

image overlay Orlando International Airport (MCO) South Terminal C Project
Systèmes de traitement des bagages

Amérique du Nord

Orlando International Airport (MCO) South Terminal C Project

As a member of the BHS design‑build team, Studdiford Technical Solutions, LLC (STS) provided BHS subject matter expertise, design oversight, system integration support, and commissioning services for the South Terminal.

image overlay Terminal 2 BHS DeviceNet Replacement at Oakland San Francisco Bay Airport (OAK)
Systèmes de traitement des bagages

Amérique du Nord

Terminal 2 BHS DeviceNet Replacement at Oakland San Francisco Bay Airport (OAK)

Studdiford Technical Solutions, LLC (STS) managed the modernization of the Terminal 2 baggage handling system through controls upgrades, commissioning, and implementation oversight.

Un partenariat pour des résultats : Des mégaprojets aux succès de taille moyenne.

Tout en nous appuyant sur notre solide réputation, nous souhaitons mettre en avant notre capacité à fournir des solutions rentables pour des projets de taille moyenne, en formant nos clients aux dernières technologies et en garantissant leur réussite à long terme. Nous donnons la priorité à l'établissement de relations avec les clients, et pas seulement avec les clients, en travaillant souvent en étroite collaboration avec de petites équipes dans les départements de planification et de développement des aéroports afin d'obtenir des résultats exceptionnels.

Demande d'information Voir les projets

BNP Associates, Inc. est le leader mondial dans la fourniture de services de conseil spécialisés aux industries du transport aérien et de la logistique. 

© 2025 BNP Associates, INC. tous droits réservés