Aller au contenu Page sur la protection de la vie privée
Retour aux projets

Incheon International Airport (ICN) Phase 3 and 4 Baggage Handling System

Following the success of Phase 1 and 2 developments at Incheon International Airport, Incheon International Airport Corporation (IIAC) continued to engage BNP to design the baggage handling system (BHS) for Phase 3 and Phase 4 development.

image overlay Aerial view of a large international airport with multiple terminals, runways, and aircraft.

Vue d'ensemble

Following the success of Phase 1 and 2 developments at Incheon International Airport, Incheon International Airport Corporation (IIAC) continued to engage BNP to design the baggage handling system (BHS) for Phase 3 and Phase 4 development. This marks a 20-year professional relationship milestone between IIAC and BNP. IIAC has been using BNP exclusively for all their baggage system consulting services since 1997.

Phase 3 and 4 Development

In Phase 3 development, BNP designed the BHS in the new Terminal 2 building and the BHS connection between the existing Concourse A and the Main Terminal Building. Phase 4 development sets out to increase handling capacity with system expansion and modifications to the Terminal 2 building that was constructed during Phase 3. The Phase 4 system was designed so that any baggage supplier can provide the system. (The scope of work requiring the original OEM to modify was limited, to keep the tender competitive.)

Services Provided

BNP’s services included demand analysis, conceptual design, detailed design, general building and services coordination, preparation of tender documents, and construction services. Once completed, the combined handling capacity of Incheon International Airport will be 106 million annual passengers.

DÉTAILS DU PROJET

Phase 3 System Components

For Phase 3 the BHS comprised approximately 40 km of equipment, including four tilt tray sorters, an Individual Carrier System (ICS), an ICS-based early baggage storage system with 3,200 positions, 216 check-in positions, 22 make-up carousals, 24 laterals, ten transfer input conveyors, and ten dual feed claim devices.

In addition, baggage screening is accomplished with more than 40 customs screening/advanced technology X-ray machines and 16 computed tomography X-ray machines. The ICS, which forms the backbone of the baggage handling system, also connects the new Terminal 2 to the existing Concourse A and Main Terminal Building.

Phase 4 Expansion

In Phase 4, the expansion of the BHS included four final tilt tray sorters in the newly constructed terminal piers. There were also 3,000 additional positions added into the Early Bag Storage (EBS) system, six new check-in islands, 24 new make-up carousals, 30 new laterals, eight new transfer inputs, and 10 new reclaim carousels.

During Phase 4, a dedicated transfer screening system was provided in each hemisphere, which offers additional system redundancy as well as flexibility.

Début du projet

2011

Client

Incheon International Airport Corporation (IIAC)

Étendue des services

  • Design conceptuel
  • Conception détaillée
  • Documents contractuels
  • Construction Management & Supervision

Région

Asie

Systèmes de manutention des bagages : histoires à succès

image overlay TSA Recapitalization and BHS Modernization at Denver International Airport (DEN)
Systèmes de traitement des bagages

Amérique du Nord

TSA Recapitalization and BHS Modernization at Denver International Airport (DEN)

As an essential member of the PCL Construction Design-Build (DB) team, Studdiford Technical Solutions, LLC (STS) provides BHS subject matter expertise for the TSA Recapitalization and Baggage Handling System (BHS) Modernization program.

image overlay Orlando International Airport (MCO) South Terminal C Project
Systèmes de traitement des bagages

Amérique du Nord

Orlando International Airport (MCO) South Terminal C Project

As a member of the BHS design‑build team, Studdiford Technical Solutions, LLC (STS) provided BHS subject matter expertise, design oversight, system integration support, and commissioning services for the South Terminal.

image overlay Terminal 2 BHS DeviceNet Replacement at Oakland San Francisco Bay Airport (OAK)
Systèmes de traitement des bagages

Amérique du Nord

Terminal 2 BHS DeviceNet Replacement at Oakland San Francisco Bay Airport (OAK)

Studdiford Technical Solutions, LLC (STS) managed the modernization of the Terminal 2 baggage handling system through controls upgrades, commissioning, and implementation oversight.

Un partenariat pour des résultats : Des mégaprojets aux succès de taille moyenne.

Tout en nous appuyant sur notre solide réputation, nous souhaitons mettre en avant notre capacité à fournir des solutions rentables pour des projets de taille moyenne, en formant nos clients aux dernières technologies et en garantissant leur réussite à long terme. Nous donnons la priorité à l'établissement de relations avec les clients, et pas seulement avec les clients, en travaillant souvent en étroite collaboration avec de petites équipes dans les départements de planification et de développement des aéroports afin d'obtenir des résultats exceptionnels.

Demande d'information Voir les projets

BNP Associates, Inc. est le leader mondial dans la fourniture de services de conseil spécialisés aux industries du transport aérien et de la logistique. 

© 2025 BNP Associates, INC. tous droits réservés