BNP a été engagé par Changi Airport Group (CAG) pour fournir des services de conseil pour le nouveau système de traitement des bagages (BHS) du nouveau terminal 5, dans le cadre des plans d'expansion de l'aéroport international de Changi.

image overlay Detailed map of an airport layout with labeled facilities, runways, and other infrastructure.

Vue d'ensemble

BNP has been engaged by Changi Airport Group (CAG) to provide consulting services for the new Baggage Handling System (BHS) at the new Terminal 5, as part of Changi International Airport’s expansion plans. From initial master planning through concept development and detailed design, including BHS simulation and tender support, BNP has led and delivered the entire new Terminal 5 BHS design in its entirety.

Terminal Capacity and Design

The new Changi T5 is designed to accommodate 70 million passengers annually. Its design and planning are carried out deliberately and thoroughly, in close coordination with the overall master planners, terminal designers, and architects.

Integration and Coordination

Particular attention is given to the integration and interface of inter- and intra-terminal tunnels, including collaboration with the multi-disciplinary team of designers. By ensuring proper alignment and coordination of tunnels connecting existing terminals, as well as those linking multiple buildings within the new T5, the client is able to optimize construction time and cost, while also enhancing the long-term operational efficiency of key airport systems. Effective and transparent communication between BNP, the master planners, and other airport system designers is critical to the smooth execution of this process.

Future-Ready Design

As the new Terminal 5 is being developed to support the airport’s air traffic well into the 2050s, it is essential to ensure that the Baggage Handling System (BHS) is future-ready. BNP is aligning its forward-looking vision for baggage handling with the airport’s specific operational goals to deliver smart, tailored solutions designed for long-term performance and adaptability.

Début du projet

2016

Client

Changi Airport Group

Étendue des services

  • Plan directeur
  • Design conceptuel
  • Conception schématique
  • Detailed Design
  • Tender Services
  • BHS Simulation
  • Construction Management & Supervision

Région

Asie

Systèmes de manutention des bagages : histoires à succès

image overlay TSA Recapitalization and BHS Modernization at Denver International Airport (DEN)
Systèmes de traitement des bagages

Amérique du Nord

TSA Recapitalization and BHS Modernization at Denver International Airport (DEN)

As an essential member of the PCL Construction Design-Build (DB) team, Studdiford Technical Solutions, LLC (STS) provides BHS subject matter expertise for the TSA Recapitalization and Baggage Handling System (BHS) Modernization program.

image overlay Orlando International Airport (MCO) South Terminal C Project
Systèmes de traitement des bagages

Amérique du Nord

Orlando International Airport (MCO) South Terminal C Project

As a member of the BHS design‑build team, Studdiford Technical Solutions, LLC (STS) provided BHS subject matter expertise, design oversight, system integration support, and commissioning services for the South Terminal.

image overlay Terminal 2 BHS DeviceNet Replacement at Oakland San Francisco Bay Airport (OAK)
Systèmes de traitement des bagages

Amérique du Nord

Terminal 2 BHS DeviceNet Replacement at Oakland San Francisco Bay Airport (OAK)

Studdiford Technical Solutions, LLC (STS) managed the modernization of the Terminal 2 baggage handling system through controls upgrades, commissioning, and implementation oversight.

Un partenariat pour des résultats : Des mégaprojets aux succès de taille moyenne.

Tout en nous appuyant sur notre solide réputation, nous souhaitons mettre en avant notre capacité à fournir des solutions rentables pour des projets de taille moyenne, en formant nos clients aux dernières technologies et en garantissant leur réussite à long terme. Nous donnons la priorité à l'établissement de relations avec les clients, et pas seulement avec les clients, en travaillant souvent en étroite collaboration avec de petites équipes dans les départements de planification et de développement des aéroports afin d'obtenir des résultats exceptionnels.