{"id":4699,"date":"2025-06-23T16:27:29","date_gmt":"2025-06-23T16:27:29","guid":{"rendered":"https:\/\/bnpassociates.fru.qa\/project\/cargo-terminal-2-cargo-handling-system-at-hamad-international-airport-doh\/"},"modified":"2025-06-26T18:35:04","modified_gmt":"2025-06-26T18:35:04","slug":"cargo-terminal-2-cargo-handling-system-at-hamad-international-airport-doh","status":"publish","type":"project","link":"https:\/\/bnpassociates.fru.qa\/es\/project\/cargo-terminal-2-cargo-handling-system-at-hamad-international-airport-doh\/","title":{"rendered":"Cargo Terminal 2 \u2013 Cargo Handling System at Hamad International Airport (DOH)"},"content":{"rendered":"<h2>Visi\u00f3n general<\/h2>\n<p>MATAR has engaged BNP and Middle East architecture and engineering firm Dar Al-Handasah to deliver data analysis, design, simulation, engineering, tendering, and construction support for a new multi-level air cargo terminal (Terminal 2). With the ability to handle 3.3 million tons of cargo per year and covering 85,000 square meters, the new terminal at DOH is set to become one of the top three cargo facilities in the world by capacity.<\/p>\n<h3>Desarrollo de proyectos<\/h3>\n<p>BNP work began with the development of a high-level concept of operations, conceptual building and system design, and an in-depth analysis of existing processes and data, down to each AirWayBill. The initial concepts were evaluated, and a preferred concept was selected for further development<\/p>\n<p>El dise\u00f1o se revis\u00f3 con las partes interesadas y se coordin\u00f3 con el arquitecto\/ingeniero en 3D utilizando BIM.<\/p>\n<p>The project is currently in the procurement and tendering stage.<\/p>\n<h3>DETALLES DEL PROYECTO<\/h3>\n<h3>Workstations<\/h3>\n<p>One hundred lowerable workstations featuring Automated Guided Vehicle distribution, spread across three floors.<\/p>\n<h3>Unit Load Device (ULD) Storage System<\/h3>\n<ul>\n<li>80 dolly interface points with automatic dolly position alignment and LED identification screens<\/li>\n<li>55 transfer vehicles and 35 ULD hoists distributed over eight lift-and-run storage levels, providing 5,000 ULD storage positions<\/li>\n<\/ul>\n<h3>Dedicated 20ft ULD Handling Area<\/h3>\n<ul>\n<li>70 ULD storage positions<\/li>\n<li>1 elevating transfer vehicle for 20ft ULDs<\/li>\n<li>3 lowerable workstations for 20ft ULDs<\/li>\n<\/ul>\n<h3>Highly Specialized Consignment Distribution System<\/h3>\n<ul>\n<li>10,000 consignment storage positions, including three modules of Automated Storage and Retrieval Systems (ASRS) with 3,000 cage storage positions and 8 ASRS cranes<\/li>\n<li>A consignment distribution system using 100 AGVs on mezzanine levels and 30 cage hoists to deliver consignments to build and break areas<\/li>\n<\/ul>\n<h3>End-to-End Cool Chain<\/h3>\n<ul>\n<li>16 insulated refrigerated truck docks and 10 insulated ULD hoists<\/li>\n<li>500 humidity- and temperature-controlled positions (COL, CRT, and FRO) for pharmaceuticals and perishables<\/li>\n<li>12 workstations divided into two areas for handling PER and PIL cargo<\/li>\n<li>Fully temperature-controlled conveyors and ULD hoists to move ULDs from ground-floor truck docks to upper-floor build, break, or storage areas<\/li>\n<li>800 bulk storage positions, separated for PIL and PER cargo across COL, CRT, and FRO zones<\/li>\n<\/ul>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>MATAR has engaged BNP and Middle East architecture and engineering firm Dar Al-Handasah to deliver data analysis, design, simulation, engineering, tendering, and construction support for a new multi-level air cargo terminal (Terminal 2).<\/p>","protected":false},"featured_media":4700,"template":"","class_list":["post-4699","project","type-project","status-publish","has-post-thumbnail","hentry","region-middle-east","solution-cargo-solutions","solution-simulation","code-doh"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Cargo Terminal 2 \u2013 Cargo Handling System at Hamad International Airport (DOH) - BNP Associates<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cargo Terminal 2 \u2013 Cargo Handling System at Hamad International Airport (DOH) - BNP Associates\" \/>\n<meta property=\"og:description\" content=\"MATAR has engaged BNP and Middle East architecture and engineering firm Dar Al-Handasah to deliver data analysis, design, simulation, engineering, tendering, and construction support for a new multi-level air cargo terminal (Terminal 2).\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bnpassociates.fru.qa\/es\/project\/cargo-terminal-2-cargo-handling-system-at-hamad-international-airport-doh\/\" \/>\n<meta property=\"og:site_name\" content=\"BNP Associates\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-26T18:35:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/bnpassociates.fru.qa\/app\/uploads\/2025\/06\/32-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"868\" \/>\n\t<meta property=\"og:image:height\" content=\"566\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/cargo-terminal-2-cargo-handling-system-at-hamad-international-airport-doh\\\/\",\"url\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/cargo-terminal-2-cargo-handling-system-at-hamad-international-airport-doh\\\/\",\"name\":\"Cargo Terminal 2 \u2013 Cargo Handling System at Hamad International Airport (DOH) - BNP Associates\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/cargo-terminal-2-cargo-handling-system-at-hamad-international-airport-doh\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/cargo-terminal-2-cargo-handling-system-at-hamad-international-airport-doh\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/app\\\/uploads\\\/2025\\\/06\\\/32-1.jpg\",\"datePublished\":\"2025-06-23T16:27:29+00:00\",\"dateModified\":\"2025-06-26T18:35:04+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/cargo-terminal-2-cargo-handling-system-at-hamad-international-airport-doh\\\/#breadcrumb\"},\"inLanguage\":\"es-ES\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/cargo-terminal-2-cargo-handling-system-at-hamad-international-airport-doh\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es-ES\",\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/cargo-terminal-2-cargo-handling-system-at-hamad-international-airport-doh\\\/#primaryimage\",\"url\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/app\\\/uploads\\\/2025\\\/06\\\/32-1.jpg\",\"contentUrl\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/app\\\/uploads\\\/2025\\\/06\\\/32-1.jpg\",\"width\":868,\"height\":566,\"caption\":\"Large commercial building complex with parking lot and vehicles near coastline.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/cargo-terminal-2-cargo-handling-system-at-hamad-international-airport-doh\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project\",\"item\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Cargo Terminal 2 \u2013 Cargo Handling System at Hamad International Airport (DOH)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/#website\",\"url\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/\",\"name\":\"BNP Associates\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es-ES\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Cargo Terminal 2 \u2013 Cargo Handling System at Hamad International Airport (DOH) - BNP Associates","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"es_ES","og_type":"article","og_title":"Cargo Terminal 2 \u2013 Cargo Handling System at Hamad International Airport (DOH) - BNP Associates","og_description":"MATAR has engaged BNP and Middle East architecture and engineering firm Dar Al-Handasah to deliver data analysis, design, simulation, engineering, tendering, and construction support for a new multi-level air cargo terminal (Terminal 2).","og_url":"https:\/\/bnpassociates.fru.qa\/es\/project\/cargo-terminal-2-cargo-handling-system-at-hamad-international-airport-doh\/","og_site_name":"BNP Associates","article_modified_time":"2025-06-26T18:35:04+00:00","og_image":[{"width":868,"height":566,"url":"https:\/\/bnpassociates.fru.qa\/app\/uploads\/2025\/06\/32-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/bnpassociates.fru.qa\/project\/cargo-terminal-2-cargo-handling-system-at-hamad-international-airport-doh\/","url":"https:\/\/bnpassociates.fru.qa\/project\/cargo-terminal-2-cargo-handling-system-at-hamad-international-airport-doh\/","name":"Cargo Terminal 2 \u2013 Cargo Handling System at Hamad International Airport (DOH) - BNP Associates","isPartOf":{"@id":"https:\/\/bnpassociates.fru.qa\/#website"},"primaryImageOfPage":{"@id":"https:\/\/bnpassociates.fru.qa\/project\/cargo-terminal-2-cargo-handling-system-at-hamad-international-airport-doh\/#primaryimage"},"image":{"@id":"https:\/\/bnpassociates.fru.qa\/project\/cargo-terminal-2-cargo-handling-system-at-hamad-international-airport-doh\/#primaryimage"},"thumbnailUrl":"https:\/\/bnpassociates.fru.qa\/app\/uploads\/2025\/06\/32-1.jpg","datePublished":"2025-06-23T16:27:29+00:00","dateModified":"2025-06-26T18:35:04+00:00","breadcrumb":{"@id":"https:\/\/bnpassociates.fru.qa\/project\/cargo-terminal-2-cargo-handling-system-at-hamad-international-airport-doh\/#breadcrumb"},"inLanguage":"es-ES","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bnpassociates.fru.qa\/project\/cargo-terminal-2-cargo-handling-system-at-hamad-international-airport-doh\/"]}]},{"@type":"ImageObject","inLanguage":"es-ES","@id":"https:\/\/bnpassociates.fru.qa\/project\/cargo-terminal-2-cargo-handling-system-at-hamad-international-airport-doh\/#primaryimage","url":"https:\/\/bnpassociates.fru.qa\/app\/uploads\/2025\/06\/32-1.jpg","contentUrl":"https:\/\/bnpassociates.fru.qa\/app\/uploads\/2025\/06\/32-1.jpg","width":868,"height":566,"caption":"Large commercial building complex with parking lot and vehicles near coastline."},{"@type":"BreadcrumbList","@id":"https:\/\/bnpassociates.fru.qa\/project\/cargo-terminal-2-cargo-handling-system-at-hamad-international-airport-doh\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/bnpassociates.fru.qa\/"},{"@type":"ListItem","position":2,"name":"Project","item":"https:\/\/bnpassociates.fru.qa\/project\/"},{"@type":"ListItem","position":3,"name":"Cargo Terminal 2 \u2013 Cargo Handling System at Hamad International Airport (DOH)"}]},{"@type":"WebSite","@id":"https:\/\/bnpassociates.fru.qa\/#website","url":"https:\/\/bnpassociates.fru.qa\/","name":"BNP Associates","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bnpassociates.fru.qa\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es-ES"}]}},"_links":{"self":[{"href":"https:\/\/bnpassociates.fru.qa\/es\/wp-json\/wp\/v2\/project\/4699","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bnpassociates.fru.qa\/es\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/bnpassociates.fru.qa\/es\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bnpassociates.fru.qa\/es\/wp-json\/wp\/v2\/media\/4700"}],"wp:attachment":[{"href":"https:\/\/bnpassociates.fru.qa\/es\/wp-json\/wp\/v2\/media?parent=4699"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}