{"id":4679,"date":"2025-06-23T16:27:29","date_gmt":"2025-06-23T16:27:29","guid":{"rendered":"https:\/\/bnpassociates.fru.qa\/project\/xian-xianyang-international-airport-xiy-new-terminal-5-baggage-handling-system\/"},"modified":"2025-06-26T19:02:46","modified_gmt":"2025-06-26T19:02:46","slug":"xian-xianyang-international-airport-xiy-new-terminal-5-baggage-handling-system","status":"publish","type":"project","link":"https:\/\/bnpassociates.fru.qa\/es\/project\/xian-xianyang-international-airport-xiy-new-terminal-5-baggage-handling-system\/","title":{"rendered":"Nuevo sistema de tratamiento de equipajes de la terminal 5 del aeropuerto internacional Xi'an Xianyang (XIY)"},"content":{"rendered":"<h2>Visi\u00f3n general<\/h2>\n<p>China West Airport Group is developing a major new terminal spanning approximately 700,000 square meters, designed to accommodate up to 50 million passengers annually by 2030. To enhance connectivity and passenger convenience, a new Ground Transportation Center (GTC) will be constructed adjacent to the terminal to offer seamless links to subways, highways, and railways.<\/p>\n<h3>BHS Design Scope<\/h3>\n<p>BNP ha sido contratada para dise\u00f1ar el sistema de tratamiento de equipajes de la nueva terminal. Este alcance incluye el desarrollo de dise\u00f1os conceptuales y detallados para todos los sistemas de equipaje, la integraci\u00f3n del GTC en la red de equipajes de la terminal y la planificaci\u00f3n de la futura conectividad con una terminal sat\u00e9lite.<\/p>\n<h3>System Features<\/h3>\n<p>The new BHS is a fully automated, ICS-based system. In compliance with Chinese customs regulations, domestic and international baggage is initially conveyed on separate belt lines to designated top loaders. Once loaded onto carriers, the bags can share common routing throughout the system. To enhance passenger convenience, check-in islands are provided within the GTC, which allows travelers arriving via car parks or public transport to check in their bags with ease. The design also includes provisions for hotel check-in and a city check-in unloading area.<\/p>\n<h3>Design Optimization<\/h3>\n<p>BNP designed the main sortation system below the apron level to optimize space utilization and improve working conditions for baggage room operations. The system is designed with built-in redundancy that ensures each individual subsystem can continue operating at up to 75% of peak capacity, even in the event of a single point of failure. Additionally, direct-feed conveyor lines connect each check-in island to a make-up carousel, supporting efficient off-peak operations and providing a backup in the event of catastrophic system failure.<\/p>\n<h3>Project Support<\/h3>\n<p>BNP supported the project through concept design, design development, simulation, tender drawings, and technical specifications for the new Baggage Handling System (BHS), which enable China West Airport Group to procure systems through a competitive tender process. During the construction phase, BNP provided experienced personnel to support the successful delivery and commissioning of the operational BHS.<\/p>","protected":false},"excerpt":{"rendered":"<p>BNP ha sido contratada para dise\u00f1ar el sistema de tratamiento de equipajes de la nueva terminal. Este alcance incluye el desarrollo de dise\u00f1os conceptuales y detallados para todos los sistemas de equipaje, la integraci\u00f3n del GTC en la red de equipajes de la terminal y la planificaci\u00f3n de la futura conectividad con una terminal sat\u00e9lite.<\/p>","protected":false},"featured_media":4680,"template":"","class_list":["post-4679","project","type-project","status-publish","has-post-thumbnail","hentry","region-asia","solution-baggage-handling-systems","solution-simulation","code-xiy"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Xi\u2019an Xianyang International Airport (XIY) New Terminal 5 Baggage Handling System - BNP Associates<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Xi\u2019an Xianyang International Airport (XIY) New Terminal 5 Baggage Handling System - BNP Associates\" \/>\n<meta property=\"og:description\" content=\"BNP has been engaged to design the Baggage Handling System (BHS) for the new terminal. This scope includes the development of both concept and detailed designs for all baggage systems, integration of the GTC into the terminal\u2019s baggage network, and planning for future connectivity to a satellite terminal.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bnpassociates.fru.qa\/es\/project\/xian-xianyang-international-airport-xiy-new-terminal-5-baggage-handling-system\/\" \/>\n<meta property=\"og:site_name\" content=\"BNP Associates\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-26T19:02:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/bnpassociates.fru.qa\/app\/uploads\/2025\/06\/22-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1139\" \/>\n\t<meta property=\"og:image:height\" content=\"479\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/xian-xianyang-international-airport-xiy-new-terminal-5-baggage-handling-system\\\/\",\"url\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/xian-xianyang-international-airport-xiy-new-terminal-5-baggage-handling-system\\\/\",\"name\":\"Xi\u2019an Xianyang International Airport (XIY) New Terminal 5 Baggage Handling System - BNP Associates\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/xian-xianyang-international-airport-xiy-new-terminal-5-baggage-handling-system\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/xian-xianyang-international-airport-xiy-new-terminal-5-baggage-handling-system\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/app\\\/uploads\\\/2025\\\/06\\\/22-1.jpg\",\"datePublished\":\"2025-06-23T16:27:29+00:00\",\"dateModified\":\"2025-06-26T19:02:46+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/xian-xianyang-international-airport-xiy-new-terminal-5-baggage-handling-system\\\/#breadcrumb\"},\"inLanguage\":\"es-ES\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/xian-xianyang-international-airport-xiy-new-terminal-5-baggage-handling-system\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es-ES\",\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/xian-xianyang-international-airport-xiy-new-terminal-5-baggage-handling-system\\\/#primaryimage\",\"url\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/app\\\/uploads\\\/2025\\\/06\\\/22-1.jpg\",\"contentUrl\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/app\\\/uploads\\\/2025\\\/06\\\/22-1.jpg\",\"width\":1139,\"height\":479,\"caption\":\"Complex architectural diagram with intersecting lines and geometric shapes.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/xian-xianyang-international-airport-xiy-new-terminal-5-baggage-handling-system\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project\",\"item\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Xi\u2019an Xianyang International Airport (XIY) New Terminal 5 Baggage Handling System\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/#website\",\"url\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/\",\"name\":\"BNP Associates\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es-ES\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Xi\u2019an Xianyang International Airport (XIY) New Terminal 5 Baggage Handling System - BNP Associates","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"es_ES","og_type":"article","og_title":"Xi\u2019an Xianyang International Airport (XIY) New Terminal 5 Baggage Handling System - BNP Associates","og_description":"BNP has been engaged to design the Baggage Handling System (BHS) for the new terminal. This scope includes the development of both concept and detailed designs for all baggage systems, integration of the GTC into the terminal\u2019s baggage network, and planning for future connectivity to a satellite terminal.","og_url":"https:\/\/bnpassociates.fru.qa\/es\/project\/xian-xianyang-international-airport-xiy-new-terminal-5-baggage-handling-system\/","og_site_name":"BNP Associates","article_modified_time":"2025-06-26T19:02:46+00:00","og_image":[{"width":1139,"height":479,"url":"https:\/\/bnpassociates.fru.qa\/app\/uploads\/2025\/06\/22-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/bnpassociates.fru.qa\/project\/xian-xianyang-international-airport-xiy-new-terminal-5-baggage-handling-system\/","url":"https:\/\/bnpassociates.fru.qa\/project\/xian-xianyang-international-airport-xiy-new-terminal-5-baggage-handling-system\/","name":"Xi\u2019an Xianyang International Airport (XIY) New Terminal 5 Baggage Handling System - BNP Associates","isPartOf":{"@id":"https:\/\/bnpassociates.fru.qa\/#website"},"primaryImageOfPage":{"@id":"https:\/\/bnpassociates.fru.qa\/project\/xian-xianyang-international-airport-xiy-new-terminal-5-baggage-handling-system\/#primaryimage"},"image":{"@id":"https:\/\/bnpassociates.fru.qa\/project\/xian-xianyang-international-airport-xiy-new-terminal-5-baggage-handling-system\/#primaryimage"},"thumbnailUrl":"https:\/\/bnpassociates.fru.qa\/app\/uploads\/2025\/06\/22-1.jpg","datePublished":"2025-06-23T16:27:29+00:00","dateModified":"2025-06-26T19:02:46+00:00","breadcrumb":{"@id":"https:\/\/bnpassociates.fru.qa\/project\/xian-xianyang-international-airport-xiy-new-terminal-5-baggage-handling-system\/#breadcrumb"},"inLanguage":"es-ES","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bnpassociates.fru.qa\/project\/xian-xianyang-international-airport-xiy-new-terminal-5-baggage-handling-system\/"]}]},{"@type":"ImageObject","inLanguage":"es-ES","@id":"https:\/\/bnpassociates.fru.qa\/project\/xian-xianyang-international-airport-xiy-new-terminal-5-baggage-handling-system\/#primaryimage","url":"https:\/\/bnpassociates.fru.qa\/app\/uploads\/2025\/06\/22-1.jpg","contentUrl":"https:\/\/bnpassociates.fru.qa\/app\/uploads\/2025\/06\/22-1.jpg","width":1139,"height":479,"caption":"Complex architectural diagram with intersecting lines and geometric shapes."},{"@type":"BreadcrumbList","@id":"https:\/\/bnpassociates.fru.qa\/project\/xian-xianyang-international-airport-xiy-new-terminal-5-baggage-handling-system\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/bnpassociates.fru.qa\/"},{"@type":"ListItem","position":2,"name":"Project","item":"https:\/\/bnpassociates.fru.qa\/project\/"},{"@type":"ListItem","position":3,"name":"Xi\u2019an Xianyang International Airport (XIY) New Terminal 5 Baggage Handling System"}]},{"@type":"WebSite","@id":"https:\/\/bnpassociates.fru.qa\/#website","url":"https:\/\/bnpassociates.fru.qa\/","name":"BNP Associates","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bnpassociates.fru.qa\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es-ES"}]}},"_links":{"self":[{"href":"https:\/\/bnpassociates.fru.qa\/es\/wp-json\/wp\/v2\/project\/4679","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bnpassociates.fru.qa\/es\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/bnpassociates.fru.qa\/es\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bnpassociates.fru.qa\/es\/wp-json\/wp\/v2\/media\/4680"}],"wp:attachment":[{"href":"https:\/\/bnpassociates.fru.qa\/es\/wp-json\/wp\/v2\/media?parent=4679"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}