{"id":4671,"date":"2025-06-23T16:26:41","date_gmt":"2025-06-23T16:26:41","guid":{"rendered":"https:\/\/bnpassociates.fru.qa\/project\/copenhagen-airport-cph-hbs-standard-3-upgrade-project\/"},"modified":"2025-06-26T19:00:14","modified_gmt":"2025-06-26T19:00:14","slug":"copenhagen-airport-cph-hbs-standard-3-upgrade-project","status":"publish","type":"project","link":"https:\/\/bnpassociates.fru.qa\/es\/project\/copenhagen-airport-cph-hbs-standard-3-upgrade-project\/","title":{"rendered":"Copenhagen Airport (CPH) HBS Standard 3 Upgrade Project"},"content":{"rendered":"<h2>Visi\u00f3n general<\/h2>\n<p>In anticipation of increasing air traffic and the need to implement ECAC Standard 3 screening requirements, Copenhagen International Airport (CPH) planned a redesign of the existing Baggage Handling System (BHS) to enhance both screening compliance and capacity.<\/p>\n<h3>System Design and Planning<\/h3>\n<p>BNP verified the BHS requirements for a Standard 3 Hold Baggage System (HBS) and evaluated the airport&#8217;s projected development through 2040. We proposed a phased conversion of the screening and sortation system in Terminal 2 and the screening system in Terminal 3 into common-use facilities. This approach fulfilled the screening requirements while optimizing the number of required machines and improving the efficiency of existing baggage make-up areas.<\/p>\n<h3>Capacity Expansion<\/h3>\n<p>Additionally, BNP proposed the construction of a new make-up facility on the west side of the airport to further increase system capacity in anticipation of future demands. The screening machines in Terminal 3, used for transfer baggage, were also evaluated for replacement to meet non-Schengen transfer capacity.<\/p>\n<h3>Future-Proofing<\/h3>\n<p>At the conceptual stage, provisions were made for future equipment integration\u2014such as screening machines and conveyor Rights-of-Way (ROWs) in Terminal 3\u2014to ensure seamless scalability toward the 2040 development stage. Throughout the project, BNP worked closely with CPH to align BHS requirements within the constraints of the existing terminal infrastructure. The entire project was executed and coordinated using Building Information Modeling (BIM).<\/p>\n<h3>DETALLES DEL PROYECTO<\/h3>\n<h3>System Components<\/h3>\n<p>The full BHS system includes:<\/p>\n<ul>\n<li>Nine (9) fully automated in-line standard 3 screening machines<\/li>\n<li>Three (3) Tilt-Tray Sorters (TTS)<\/li>\n<li>Early Bag Storage (EBS) conveyor lanes<\/li>\n<li>146 make-up chutes<\/li>\n<\/ul>\n<h3>Terminal Configurations<\/h3>\n<p>Future ROWs were planned within the existing structure to accommodate three additional HBS machines, linking the new screening facility in Terminal 2 with sortation loops in Terminal 3. Terminal 3 includes two main check-in islands, each connected to two Standard 3 screening machines for in-line security processing. Once screened, baggage enters two TTS loops and is sorted into the designated make-up chutes.<\/p>\n<p>Terminal 2 features four reversible check-in islands designed for operational redundancy. These connect to two new ticketing lines, which divert baggage to four screening lines feeding into the new Standard 3 machines. Cleared baggage for Terminal 2 is routed to the new make-up facility in the west, while baggage for Terminal 3 is transported via existing tunnel conveyors to existing make-up chutes.<\/p>","protected":false},"excerpt":{"rendered":"<p>In anticipation of increasing air traffic and the need to implement ECAC Standard 3 screening requirements, Copenhagen International Airport (CPH) planned a redesign of the existing Baggage Handling System (BHS) to enhance both screening compliance and capacity.<\/p>","protected":false},"featured_media":4672,"template":"","class_list":["post-4671","project","type-project","status-publish","has-post-thumbnail","hentry","region-europe","solution-baggage-handling-systems","code-cph"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Copenhagen Airport (CPH) HBS Standard 3 Upgrade Project - BNP Associates<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Copenhagen Airport (CPH) HBS Standard 3 Upgrade Project - BNP Associates\" \/>\n<meta property=\"og:description\" content=\"In anticipation of increasing air traffic and the need to implement ECAC Standard 3 screening requirements, Copenhagen International Airport (CPH) planned a redesign of the existing Baggage Handling System (BHS) to enhance both screening compliance and capacity.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bnpassociates.fru.qa\/es\/project\/copenhagen-airport-cph-hbs-standard-3-upgrade-project\/\" \/>\n<meta property=\"og:site_name\" content=\"BNP Associates\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-26T19:00:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/bnpassociates.fru.qa\/app\/uploads\/2025\/06\/18-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"406\" \/>\n\t<meta property=\"og:image:height\" content=\"240\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/copenhagen-airport-cph-hbs-standard-3-upgrade-project\\\/\",\"url\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/copenhagen-airport-cph-hbs-standard-3-upgrade-project\\\/\",\"name\":\"Copenhagen Airport (CPH) HBS Standard 3 Upgrade Project - BNP Associates\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/copenhagen-airport-cph-hbs-standard-3-upgrade-project\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/copenhagen-airport-cph-hbs-standard-3-upgrade-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/app\\\/uploads\\\/2025\\\/06\\\/18-1.png\",\"datePublished\":\"2025-06-23T16:26:41+00:00\",\"dateModified\":\"2025-06-26T19:00:14+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/copenhagen-airport-cph-hbs-standard-3-upgrade-project\\\/#breadcrumb\"},\"inLanguage\":\"es-ES\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/copenhagen-airport-cph-hbs-standard-3-upgrade-project\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es-ES\",\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/copenhagen-airport-cph-hbs-standard-3-upgrade-project\\\/#primaryimage\",\"url\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/app\\\/uploads\\\/2025\\\/06\\\/18-1.png\",\"contentUrl\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/app\\\/uploads\\\/2025\\\/06\\\/18-1.png\",\"width\":406,\"height\":240,\"caption\":\"Lethal-looking assault rifle with a long ammunition magazine and scope.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/copenhagen-airport-cph-hbs-standard-3-upgrade-project\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project\",\"item\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/project\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Copenhagen Airport (CPH) HBS Standard 3 Upgrade Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/#website\",\"url\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/\",\"name\":\"BNP Associates\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/bnpassociates.fru.qa\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es-ES\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Copenhagen Airport (CPH) HBS Standard 3 Upgrade Project - BNP Associates","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"es_ES","og_type":"article","og_title":"Copenhagen Airport (CPH) HBS Standard 3 Upgrade Project - BNP Associates","og_description":"In anticipation of increasing air traffic and the need to implement ECAC Standard 3 screening requirements, Copenhagen International Airport (CPH) planned a redesign of the existing Baggage Handling System (BHS) to enhance both screening compliance and capacity.","og_url":"https:\/\/bnpassociates.fru.qa\/es\/project\/copenhagen-airport-cph-hbs-standard-3-upgrade-project\/","og_site_name":"BNP Associates","article_modified_time":"2025-06-26T19:00:14+00:00","og_image":[{"width":406,"height":240,"url":"https:\/\/bnpassociates.fru.qa\/app\/uploads\/2025\/06\/18-1.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/bnpassociates.fru.qa\/project\/copenhagen-airport-cph-hbs-standard-3-upgrade-project\/","url":"https:\/\/bnpassociates.fru.qa\/project\/copenhagen-airport-cph-hbs-standard-3-upgrade-project\/","name":"Copenhagen Airport (CPH) HBS Standard 3 Upgrade Project - BNP Associates","isPartOf":{"@id":"https:\/\/bnpassociates.fru.qa\/#website"},"primaryImageOfPage":{"@id":"https:\/\/bnpassociates.fru.qa\/project\/copenhagen-airport-cph-hbs-standard-3-upgrade-project\/#primaryimage"},"image":{"@id":"https:\/\/bnpassociates.fru.qa\/project\/copenhagen-airport-cph-hbs-standard-3-upgrade-project\/#primaryimage"},"thumbnailUrl":"https:\/\/bnpassociates.fru.qa\/app\/uploads\/2025\/06\/18-1.png","datePublished":"2025-06-23T16:26:41+00:00","dateModified":"2025-06-26T19:00:14+00:00","breadcrumb":{"@id":"https:\/\/bnpassociates.fru.qa\/project\/copenhagen-airport-cph-hbs-standard-3-upgrade-project\/#breadcrumb"},"inLanguage":"es-ES","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bnpassociates.fru.qa\/project\/copenhagen-airport-cph-hbs-standard-3-upgrade-project\/"]}]},{"@type":"ImageObject","inLanguage":"es-ES","@id":"https:\/\/bnpassociates.fru.qa\/project\/copenhagen-airport-cph-hbs-standard-3-upgrade-project\/#primaryimage","url":"https:\/\/bnpassociates.fru.qa\/app\/uploads\/2025\/06\/18-1.png","contentUrl":"https:\/\/bnpassociates.fru.qa\/app\/uploads\/2025\/06\/18-1.png","width":406,"height":240,"caption":"Lethal-looking assault rifle with a long ammunition magazine and scope."},{"@type":"BreadcrumbList","@id":"https:\/\/bnpassociates.fru.qa\/project\/copenhagen-airport-cph-hbs-standard-3-upgrade-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/bnpassociates.fru.qa\/"},{"@type":"ListItem","position":2,"name":"Project","item":"https:\/\/bnpassociates.fru.qa\/project\/"},{"@type":"ListItem","position":3,"name":"Copenhagen Airport (CPH) HBS Standard 3 Upgrade Project"}]},{"@type":"WebSite","@id":"https:\/\/bnpassociates.fru.qa\/#website","url":"https:\/\/bnpassociates.fru.qa\/","name":"BNP Associates","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bnpassociates.fru.qa\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es-ES"}]}},"_links":{"self":[{"href":"https:\/\/bnpassociates.fru.qa\/es\/wp-json\/wp\/v2\/project\/4671","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bnpassociates.fru.qa\/es\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/bnpassociates.fru.qa\/es\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bnpassociates.fru.qa\/es\/wp-json\/wp\/v2\/media\/4672"}],"wp:attachment":[{"href":"https:\/\/bnpassociates.fru.qa\/es\/wp-json\/wp\/v2\/media?parent=4671"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}