East Midfield Cargo Terminal and Forward Transfer Facility at Abu Dhabi International Airport (AUH)

Etihad Airport Services Cargo (EASC) retained BNP to provide data analysis, design, simulation, engineering, tendering, and construction support for a new air cargo terminal (EMCT) and a forward cargo staging facility.

image overlay Large cargo shipping terminal with containers, cranes, and cityscape.

Visión general

Etihad Airport Services Cargo (EASC) retained BNP to provide data analysis, design, simulation, engineering, tendering, and construction support for a new air cargo terminal (EMCT) and a forward cargo staging facility.

The main cargo terminal will handle 1 million tons of cargo per year and cover 70,000 square meters. A smaller fully airside forward transfer facility, covering 6,500 square meters and handling 250,000 tons per year, will support high transit volumes and help reduce pressure on the main cargo terminal.

Project Development

BNP work began with the development of a high-level concept of operations, conceptual building and system design, and an in-depth analysis of existing processes and data, down to each AirWayBill. The initial concepts were evaluated, and a preferred concept was selected for further development with an architect/engineer (ADPi/Meinhardt) that the airport separately retained.

The design was reviewed with the stakeholders and coordinated with the architect/engineer in 3D using BIM.

Tender Support and Construction

BNP supported EASC with the tendering of the MHS and evaluation/selection of the supplier.

The project is currently under construction, with the MHS being provided by Lodige Industries. The EMCT cargo handling system features a ULD storage system comprising 34 dolly interface points and four elevating transfer vehicles, which service 1000 ULD storage positions.

DETALLES DEL PROYECTO

Main Cargo Terminal Design

The design incorporates:

  • 34 Dolly interface points
  • 4 Elevating Transfer Vehicles
  • 1000 ULD storage positions
  • 32 Lowerable Workstations featuring Automated Guided Vehicle distribution.
  • 41 Truck docks equipped with dock levelers and scissor lifts to cater to a wide fleet mix, including roller trucks.
  • 5,500 Consignment Storage Positions: 2 modules of Automated Storage and Retrieval Systems (ASRS), each containing 2,750 In-House-Pallet storage positions and 8 ASRS Cranes.
  • The facility features a comprehensive end-to-end cool chain system that includes eight insulated dolly interfaces, 12 insulated truck docks—segregated for perishables (PER) and pharmaceuticals (PIL)—and two insulated scissor lifts for handling temperature-sensitive ULDs. It offers more than 1,000 pallet positions with humidity and temperature control across COL, CRT, and FRO ranges. Additionally, the system includes 80 cool ULD storage cells. For cargo processing, 16 workstations are distributed across four areas, dedicated to handling PER and PIL cargo at COL and CRT temperature levels.
  • The dedicated mail sorting area includes a cross-belt sorter and 21 chutes for handling mail bags.

Forward Transfer Facility

The Forward Transfer Facility Cargo Handling System features a ULD Storage System consisting of the following:

  • 17 dolly interface points, eight fully enclosed to accommodate the handling of COL and CRT ULDs.
  • 4 ETVs servicing 600 ULD positions, of which 80 are temperature-controlled for storing COL and CRT Cargo.
  • Integrated ULD Screening Capability.

Inicio del proyecto

2023

Cliente

Etihad Airport Services Cargo

Alcance del servicio

  • Estudio de análisis
  • Diseño conceptual
  • Desarrollo del diseño
  • 3D Simulation
  • Documentación de la licitación
  • Tender Support
  • Administración de la construcción
  • Pruebas y puesta en servicio

Región

Oriente Próximo

Cargo Solutions Success Stories

image overlay Cargo Terminal 2 Mail and Courier Handling at Hamad International Airport (DOH)
Soluciones de carga

Oriente Próximo

Handling de correo y mensajería de la Terminal 2 de carga del Aeropuerto Internacional de Hamad (DOH)

MATAR ha contratado a BNP y a la empresa líder en Oriente Medio Dar Al-Handasah para los servicios de diseño, ingeniería, licitación y administración de la construcción de una nueva terminal de carga aérea (Terminal 2).

image overlay Cargo Mega Terminal Upgrade & Expansion at Dubai International Airport (DXB)
Soluciones de carga

Oriente Próximo

Modernización y ampliación de la mega terminal de carga del Aeropuerto Internacional de Dubai (DXB)

La mega terminal de carga existente en el DXB se acercaba a su capacidad y tenía un bajo nivel de automatización. BNP fue contratada para revisar, compilar y validar los resultados de los análisis anteriores.

image overlay Technical Feasibility Study of the MHS for the Redevelopment of the Hongkong Post Air Mail Center
Soluciones de carga

Asia

Estudio de Viabilidad Técnica del MHS para la Reurbanización del Centro de Correo Aéreo de Hongkong Post

Hongkong Post remodelará el actual Centro de Correo Aéreo del Aeropuerto Internacional de Hong Kong, y BNP fue contratada para prestar servicios de consultoría para un estudio de viabilidad de la remodelación.

Asociarse para obtener resultados: De los megaproyectos al éxito a mediana escala.

Al tiempo que nos basamos en nuestra sólida reputación, pretendemos mostrar nuestra capacidad para ofrecer soluciones rentables para proyectos de tamaño medio, formando a los clientes en las últimas tecnologías y garantizando su éxito a largo plazo. Damos prioridad a la creación de relaciones con los clientes, no sólo con los clientes, a menudo trabajando en estrecha colaboración con pequeños equipos en los departamentos de planificación y desarrollo de aeropuertos para ofrecer resultados excepcionales.

Solicitar información Ver proyectos

BNP Associates, Inc. es líder mundial en la prestación de servicios especializados de consultoría a las industrias del transporte aéreo y la logística. 

© 2025 BNP Associates, INC. todos los derechos reservados