Saltar al contenido Página de privacidad
Volver a Proyectos

E-Commerce Facility Sorting and Warehousing at Istanbul International Airport (IST)

MNG Airlines engaged BNP for a feasibility study to develop two facilities for E-commerce and warehousing.

image overlay Stacks of wooden pallets and loading equipment in a large industrial warehouse.

Visión general

MNG Airlines engaged BNP for a feasibility study to develop two facilities for E-commerce and warehousing.

  • An e-commerce processing/sorting facility for processing e-commerce items from air to ground transport, including sorting, security, customs processes, and storage for customs-bonded goods.
  • An airside customs-free zone warehouse to act as a quick response B2B fulfillment center for premium products via air, leveraging Istanbul International Airport as a transit and distribution hub between the East and the West.

E-commerce Facility

For the e-commerce facility, several options were evaluated based on the available plots of land, the potential reuse or modification of existing facilities, and the level of automation. An exciting challenge in this project is the significant elevation difference (~7 meters) across the plot, the split lots, and existing substantial utilities. Management briefs evaluating the options were provided, including high-level cost estimates.

Proposed Technology

The proposed technology consisted of a stacked set of cross-belt sortation systems that sorted items to chutes connecting to trolleys. The trolleys feature a flexible bottom that lowers as weight is added, thus reducing the drop distance from the chute into the trolley. The trolleys can be manually moved around, towed with a small tractor, or handled by automated guided vehicles (AGVs) in the future. The capacity is 15,000 items per hour to 100 chutes/destinations.

Airside Free Zone Warehouse

For the airside free zone warehouse, the lot was fixed. Still, there was uncertainty about the potential business that required a high degree of flexibility to transition from a low-cost, manual operation to a high-throughput, automated process without significant operational disruption. The ultimate capacity when maximizing the site and automation is 37,000 pallet positions.

The warehouse includes security and customs functions for incidental use. It has direct airside access with ULD break and builds positions to enable quick response time from order to fulfillment.

Inicio del proyecto

2019

Cliente

MNG Airlines, Istanbul International Airport (IST)

Alcance del servicio

  • Feasibility Study

Región

Oriente Próximo

Cargo Solutions Success Stories

image overlay Cargo Terminal 2 Mail and Courier Handling at Hamad International Airport (DOH)
Soluciones de carga

Oriente Próximo

Handling de correo y mensajería de la Terminal 2 de carga del Aeropuerto Internacional de Hamad (DOH)

MATAR ha contratado a BNP y a la empresa líder en Oriente Medio Dar Al-Handasah para los servicios de diseño, ingeniería, licitación y administración de la construcción de una nueva terminal de carga aérea (Terminal 2).

image overlay Cargo Mega Terminal Upgrade & Expansion at Dubai International Airport (DXB)
Soluciones de carga

Oriente Próximo

Modernización y ampliación de la mega terminal de carga del Aeropuerto Internacional de Dubai (DXB)

La mega terminal de carga existente en el DXB se acercaba a su capacidad y tenía un bajo nivel de automatización. BNP fue contratada para revisar, compilar y validar los resultados de los análisis anteriores.

image overlay Technical Feasibility Study of the MHS for the Redevelopment of the Hongkong Post Air Mail Center
Soluciones de carga

Asia

Estudio de Viabilidad Técnica del MHS para la Reurbanización del Centro de Correo Aéreo de Hongkong Post

Hongkong Post remodelará el actual Centro de Correo Aéreo del Aeropuerto Internacional de Hong Kong, y BNP fue contratada para prestar servicios de consultoría para un estudio de viabilidad de la remodelación.

Asociarse para obtener resultados: De los megaproyectos al éxito a mediana escala.

Al tiempo que nos basamos en nuestra sólida reputación, pretendemos mostrar nuestra capacidad para ofrecer soluciones rentables para proyectos de tamaño medio, formando a los clientes en las últimas tecnologías y garantizando su éxito a largo plazo. Damos prioridad a la creación de relaciones con los clientes, no sólo con los clientes, a menudo trabajando en estrecha colaboración con pequeños equipos en los departamentos de planificación y desarrollo de aeropuertos para ofrecer resultados excepcionales.

Solicitar información Ver proyectos

BNP Associates, Inc. es líder mundial en la prestación de servicios especializados de consultoría a las industrias del transporte aéreo y la logística. 

© 2025 BNP Associates, INC. todos los derechos reservados