Saltar al contenido Página de privacidad
Volver a Proyectos

Brisbane Airport (BNE) Expansion and Security Upgrade Projects

Since 2019, BNP has been retained by the Brisbane Airport Corporation (BAC) for a number of studies, including both small and large projects.

image overlay Detailed schematic diagram of the internal components and wiring of a complex electronic device.

Visión general

Since 2019, BNP has been retained by the Brisbane Airport Corporation (BAC) for a number of studies, including both small and large projects. BNP continues to provide BHS Consulting services to BAC with full-time onsite staff during construction and remote support for other studies and projects.

Initial Studies and Development

Initially, BNP studied the feasibility of Standard 3 security upgrades and capacity expansions for the International Terminal Building (ITB) and the Domestic Terminal Building (DTB). Following these feasibility studies, BNP was retained, along with multidisciplinary firms, to develop the projects and provide construction administration services.

International Terminal Building (ITB)

For ITB, the scope was limited to security upgrades only, with the capacity works deferred until a later time, but safeguarded in the security upgrade works. After completing some enabling steps to adjust the claim feed conveyors, a new mezzanine for the four Rapiscan RTT110 ECAC Standard 3 machines and a new support complex for the security operators will be constructed. With the new screening machine in place, a delicate staging/phasing process begins to reroute the check-in and transfer baggage from the existing screening equipment to the new one.

Domestic Terminal Building (DTB)

For DTB, the existing three separate systems are planned to be combined into a single, common-use system with a central Checked Baggage System (CBS), featuring four Rapiscan RTT110 ECAC Standard 3 machines, and a new support complex located at the central pier of the terminal. This provides significant benefits in terms of flexible capacity, reduced quantity of screening machines, and operational benefits. The DTB project results in an overhaul and replacement of the majority of the DTB baggage handling system.

Implementation Challenges

Both projects must be executed in live environments, requiring intricate staging and phasing to be coordinated with the building construction facilities and related passenger checkpoint construction activities. This detailed staging and phasing were developed during the design and coordinated by stage or phase in BIM to test feasibility.

Tender Support and Construction

BNP subsequently assisted BAC by preparing the technical input/specifications for the BHS tenders and supported BAC during the tendering process and evaluation.

Both projects are currently under construction, with the BHS being provided by Alstef. BNP is providing support to BAC through construction submittal reviews, progress monitoring, inspections, and witness testing, among other services.

Ongoing Support

In parallel, BNP is providing BAC support for various studies, such as check-in CUSS projects under a framework agreement.

Inicio del proyecto

2020

Cliente

Brisbane Airport Corporation Pty Ltd

Alcance del servicio

  • Feasibility Study
  • Estudio de análisis
  • Diseño conceptual
  • Desarrollo del diseño
  • 3D Simulation
  • Documentación de la licitación
  • Tender Support
  • Administración de la construcción
  • Pruebas y puesta en servicio

Región

Oceania

Casos de éxito de los sistemas de tratamiento de equipajes

image overlay New Terminal A Baggage Handling System at Newark Liberty International Airport (EWR)
Sistemas de tratamiento de equipajes

Norteamérica

Nuevo sistema de tratamiento de equipajes de la Terminal A del Aeropuerto Internacional Newark Liberty (EWR)

STV, Inc. contrató a BNP como Ingeniero de Registro para el Sistema de Tratamiento de Equipajes (BHS) de la Nueva Terminal A del Aeropuerto Internacional Newark Liberty (EWR).

image overlay Atlanta-Hartsfield International Airport (ATL) L-MOD Curbside Design
Sistemas de tratamiento de equipajes

Norteamérica

Aeropuerto Internacional de Atlanta-Hartsfield (ATL) L-MOD Curbside Design

BNP Associates, en colaboración con HOK, rediseñó las cintas transportadoras de la acera sureste y los sistemas de manipulación de paquetes Delta Dash para hacer sitio a los nuevos soportes de las marquesinas que se estaban añadiendo como parte del programa L-MOD.

image overlay Tampa International Airport (TPA) Outbound Baggage System Security Enhancement Project
Sistemas de tratamiento de equipajes

Norteamérica

Proyecto de mejora de la seguridad del sistema de equipajes de salida del Aeropuerto Internacional de Tampa (TPA)

BNP Associates, Inc. fue contratada por la Autoridad de Aviación del Condado de Hillsborough para validar el diseño existente del Sistema de Inspección de Equipajes Facturados (CBIS) 30% y desarrollarlo 100%, incluyendo la aprobación de la TSA.

Asociarse para obtener resultados: De los megaproyectos al éxito a mediana escala.

Al tiempo que nos basamos en nuestra sólida reputación, pretendemos mostrar nuestra capacidad para ofrecer soluciones rentables para proyectos de tamaño medio, formando a los clientes en las últimas tecnologías y garantizando su éxito a largo plazo. Damos prioridad a la creación de relaciones con los clientes, no sólo con los clientes, a menudo trabajando en estrecha colaboración con pequeños equipos en los departamentos de planificación y desarrollo de aeropuertos para ofrecer resultados excepcionales.

Solicitar información Ver proyectos

BNP Associates, Inc. es líder mundial en la prestación de servicios especializados de consultoría a las industrias del transporte aéreo y la logística. 

© 2025 BNP Associates, INC. todos los derechos reservados