Technische Machbarkeitsstudie des MHS für den Umbau des Hongkong Post Air Mail Center

Hongkong Post wird das bestehende Airmail Center am Hong Kong International Airport sanieren, und BNP wurde beauftragt, Beratungsleistungen für eine Machbarkeitsstudie zur Sanierung zu erbringen.

image overlay A modern, multi-level stadium structure with numerous seating areas, concession stands, and surrounding parking lots.

Übersicht

Hongkong Post will redevelop the existing Airmail Center at Hong Kong International Airport, and BNP was engaged to provide consultancy services for a redevelopment feasibility study. The principal intent of the redevelopment was to increase the operational capacity of the existing site without taking additional land while remaining within the height limits of the site close to the runway. Other objectives included automating and consolidating all mail-handling processes, integrating new mail products related to cross-border and international e-commerce, and enabling full tracking and tracing of all mail throughout the handling process. The conceptual design and supporting information were used to achieve government approval and funding for the project to proceed.

Technology Evaluation

A key part of the design phase was reviewing different technologies and handling methods for each step of the mail process. Two main approaches were considered: bulk-level handling and item-level handling. Bulk-level handling utilizes pallet cages that hold multiple mailbags, offering high storage density, which initially seems ideal for a space-limited building. However, this method requires several handling and sorting steps, including unloading and reloading mailbags from and to the cages for destination sorting. These extra steps add time and take up space, reducing the overall benefit of high-density storage.

Item-Level Handling Solution

The second approach involved item-level handling, where each bag is managed individually. The main challenge of the item-level approach is space-efficient storage of the individual bags; for this, a shuttle rack storage system (lift and run) was chosen. Shuttle rack systems have become common in e-commerce applications where fast response and high throughput are essential. The high throughput achievable with a shuttle rack storage system also allows it to function as a sorter, thereby eliminating an entire set of sorting equipment.

System Advantages

Another key advantage of the shuttle rack storage system is that there are no constraints on the timing or sequence of sorting throughout the day. If a conventional cross-belt sorter is used, dedicated timeslots for sorting different categories of mail are required, which slows the process and introduces early cut-off times for the receipt of mail before the sorting time window, both of which degrade the overall capacity of the facility.

Project Approval

BNP supported Hongkong Post through the government submission and approval process to secure the budget of HK$4.6B for the redevelopment project.

Projektstart

2018

Kunde

Hongkong Post

Umfang der Dienstleistung

  • Demand Analysis
  • Process Definition
  • Technology Study
  • Security Process Design
  • Ergonomische Verbesserungen
  • Site Layout and Traffic Management
  • Conceptual Design of the MHS and Operational Facility
  • Design Coordination for Building Compliance
  • Construction Phasing and Program Costing

Region

Asien

Cargo Solutions Erfolgsgeschichten

image overlay Cargo Terminal 2 Mail and Courier Handling at Hamad International Airport (DOH)
Frachtlösungen

Naher Osten

Frachtterminal 2 Post- und Kurierabfertigung am Internationalen Flughafen Hamad (DOH)

MATAR hat BNP und die führende A&E-Firma des Nahen Ostens, Dar Al-Handasah, mit der Planung, dem Engineering, der Ausschreibung und der Bauleitung für ein neues Luftfrachtterminal (Terminal 2) beauftragt.

image overlay Cargo Mega Terminal Upgrade & Expansion at Dubai International Airport (DXB)
Frachtlösungen

Naher Osten

Upgrade und Erweiterung des Mega-Frachtterminals am internationalen Flughafen Dubai (DXB)

Das bestehende Cargo-Mega-Terminal in DXB war nahezu ausgelastet und wies einen geringen Automatisierungsgrad auf. BNP wurde mit der Überprüfung, Zusammenstellung und Validierung der früheren Analyseergebnisse beauftragt.

image overlay Postal Automation Design Services at the Northern Taiwan Mail Processing Center
Frachtlösungen

Asien

Postal Automation Design Services at the Northern Taiwan Mail Processing Center

In 2017, BNP partnered with the local consultancy firm Sinotech to provide postal automation design services for the Northern Taiwan Mail Processing Center.

Partnerschaften für Ergebnisse: Von Mega-Projekten zum mittelgroßen Erfolg.

Auf der Grundlage unseres guten Rufs wollen wir unsere Fähigkeit unter Beweis stellen, kosteneffiziente Lösungen für mittelgroße Projekte zu liefern, unsere Kunden über die neuesten Technologien zu informieren und ihren langfristigen Erfolg zu sichern. Wir legen Wert auf den Aufbau von Beziehungen zu unseren Kunden, nicht nur zu den Kunden, und arbeiten oft eng mit kleinen Teams in den Abteilungen für Flughafenplanung und -entwicklung zusammen, um außergewöhnliche Ergebnisse zu erzielen.

Informationen anfordern Siehe Projekte

BNP Associates, Inc. ist der weltweit führende Anbieter von spezialisierten Beratungsdienstleistungen für die Luftverkehrs- und Logistikbranche. 

© 2025 BNP Associates, INC. alle Rechte vorbehalten