Incheon International Airport (ICN) Phase 3 and 4 Baggage Handling System

Following the success of Phase 1 and 2 developments at Incheon International Airport, Incheon International Airport Corporation (IIAC) continued to engage BNP to design the baggage handling system (BHS) for Phase 3 and Phase 4 development.

image overlay Aerial view of a large international airport with multiple terminals, runways, and aircraft.

Übersicht

Following the success of Phase 1 and 2 developments at Incheon International Airport, Incheon International Airport Corporation (IIAC) continued to engage BNP to design the baggage handling system (BHS) for Phase 3 and Phase 4 development. This marks a 20-year professional relationship milestone between IIAC and BNP. IIAC has been using BNP exclusively for all their baggage system consulting services since 1997.

Phase 3 and 4 Development

In Phase 3 development, BNP designed the BHS in the new Terminal 2 building and the BHS connection between the existing Concourse A and the Main Terminal Building. Phase 4 development sets out to increase handling capacity with system expansion and modifications to the Terminal 2 building that was constructed during Phase 3. The Phase 4 system was designed so that any baggage supplier can provide the system. (The scope of work requiring the original OEM to modify was limited, to keep the tender competitive.)

Services Provided

BNP’s services included demand analysis, conceptual design, detailed design, general building and services coordination, preparation of tender documents, and construction services. Once completed, the combined handling capacity of Incheon International Airport will be 106 million annual passengers.

PROJEKTDETAILS

Phase 3 System Components

For Phase 3 the BHS comprised approximately 40 km of equipment, including four tilt tray sorters, an Individual Carrier System (ICS), an ICS-based early baggage storage system with 3,200 positions, 216 check-in positions, 22 make-up carousals, 24 laterals, ten transfer input conveyors, and ten dual feed claim devices.

In addition, baggage screening is accomplished with more than 40 customs screening/advanced technology X-ray machines and 16 computed tomography X-ray machines. The ICS, which forms the backbone of the baggage handling system, also connects the new Terminal 2 to the existing Concourse A and Main Terminal Building.

Phase 4 Expansion

In Phase 4, the expansion of the BHS included four final tilt tray sorters in the newly constructed terminal piers. There were also 3,000 additional positions added into the Early Bag Storage (EBS) system, six new check-in islands, 24 new make-up carousals, 30 new laterals, eight new transfer inputs, and 10 new reclaim carousels.

During Phase 4, a dedicated transfer screening system was provided in each hemisphere, which offers additional system redundancy as well as flexibility.

Projektstart

2011

Kunde

Incheon International Airport Corporation (IIAC)

Umfang der Dienstleistung

  • Konzeptionelle Gestaltung
  • Detail Design
  • Contract Documents
  • Construction Management & Supervision

Region

Asien

Baggage Handling Systems Erfolgsgeschichten

image overlay TSA Recapitalization and BHS Modernization at Denver International Airport (DEN)
Gepäckabfertigungssysteme

Nord-Amerika

TSA Recapitalization and BHS Modernization at Denver International Airport (DEN)

As an essential member of the PCL Construction Design-Build (DB) team, Studdiford Technical Solutions, LLC (STS) provides BHS subject matter expertise for the TSA Recapitalization and Baggage Handling System (BHS) Modernization program.

image overlay Orlando International Airport (MCO) South Terminal C Project
Gepäckabfertigungssysteme

Nord-Amerika

Orlando International Airport (MCO) South Terminal C Project

As a member of the BHS design‑build team, Studdiford Technical Solutions, LLC (STS) provided BHS subject matter expertise, design oversight, system integration support, and commissioning services for the South Terminal.

image overlay Terminal 2 BHS DeviceNet Replacement at Oakland San Francisco Bay Airport (OAK)
Gepäckabfertigungssysteme

Nord-Amerika

Terminal 2 BHS DeviceNet Replacement at Oakland San Francisco Bay Airport (OAK)

Studdiford Technical Solutions, LLC (STS) managed the modernization of the Terminal 2 baggage handling system through controls upgrades, commissioning, and implementation oversight.

Partnerschaften für Ergebnisse: Von Mega-Projekten zum mittelgroßen Erfolg.

Auf der Grundlage unseres guten Rufs wollen wir unsere Fähigkeit unter Beweis stellen, kosteneffiziente Lösungen für mittelgroße Projekte zu liefern, unsere Kunden über die neuesten Technologien zu informieren und ihren langfristigen Erfolg zu sichern. Wir legen Wert auf den Aufbau von Beziehungen zu unseren Kunden, nicht nur zu den Kunden, und arbeiten oft eng mit kleinen Teams in den Abteilungen für Flughafenplanung und -entwicklung zusammen, um außergewöhnliche Ergebnisse zu erzielen.

Informationen anfordern Siehe Projekte

BNP Associates, Inc. ist der weltweit führende Anbieter von spezialisierten Beratungsdienstleistungen für die Luftverkehrs- und Logistikbranche. 

© 2025 BNP Associates, INC. alle Rechte vorbehalten