Brisbane Airport (BNE) Expansion and Security Upgrade Projects

Since 2019, BNP has been retained by the Brisbane Airport Corporation (BAC) for a number of studies, including both small and large projects.

image overlay Detailed schematic diagram of the internal components and wiring of a complex electronic device.

Übersicht

Since 2019, BNP has been retained by the Brisbane Airport Corporation (BAC) for a number of studies, including both small and large projects. BNP continues to provide BHS Consulting services to BAC with full-time onsite staff during construction and remote support for other studies and projects.

Initial Studies and Development

Initially, BNP studied the feasibility of Standard 3 security upgrades and capacity expansions for the International Terminal Building (ITB) and the Domestic Terminal Building (DTB). Following these feasibility studies, BNP was retained, along with multidisciplinary firms, to develop the projects and provide construction administration services.

International Terminal Building (ITB)

For ITB, the scope was limited to security upgrades only, with the capacity works deferred until a later time, but safeguarded in the security upgrade works. After completing some enabling steps to adjust the claim feed conveyors, a new mezzanine for the four Rapiscan RTT110 ECAC Standard 3 machines and a new support complex for the security operators will be constructed. With the new screening machine in place, a delicate staging/phasing process begins to reroute the check-in and transfer baggage from the existing screening equipment to the new one.

Domestic Terminal Building (DTB)

For DTB, the existing three separate systems are planned to be combined into a single, common-use system with a central Checked Baggage System (CBS), featuring four Rapiscan RTT110 ECAC Standard 3 machines, and a new support complex located at the central pier of the terminal. This provides significant benefits in terms of flexible capacity, reduced quantity of screening machines, and operational benefits. The DTB project results in an overhaul and replacement of the majority of the DTB baggage handling system.

Implementation Challenges

Both projects must be executed in live environments, requiring intricate staging and phasing to be coordinated with the building construction facilities and related passenger checkpoint construction activities. This detailed staging and phasing were developed during the design and coordinated by stage or phase in BIM to test feasibility.

Tender Support and Construction

BNP subsequently assisted BAC by preparing the technical input/specifications for the BHS tenders and supported BAC during the tendering process and evaluation.

Both projects are currently under construction, with the BHS being provided by Alstef. BNP is providing support to BAC through construction submittal reviews, progress monitoring, inspections, and witness testing, among other services.

Ongoing Support

In parallel, BNP is providing BAC support for various studies, such as check-in CUSS projects under a framework agreement.

Projektstart

2020

Kunde

Brisbane Airport Corporation Pty Ltd

Umfang der Dienstleistung

  • Durchführbarkeitsstudie
  • Analyse Studie
  • Konzeptionelle Gestaltung
  • Design-Entwicklung
  • 3D Simulation
  • Angebotsunterlagen
  • Tender Support
  • Bauverwaltung
  • Prüfung und Inbetriebnahme

Region

Oceania

Baggage Handling Systems Erfolgsgeschichten

image overlay New Terminal A Baggage Handling System at Newark Liberty International Airport (EWR)
Gepäckabfertigungssysteme

Nord-Amerika

Neues Gepäckabfertigungssystem im Terminal A des internationalen Flughafens Newark Liberty (EWR)

STV, Inc. beauftragte BNP mit der Planung des Gepäckabfertigungssystems (BHS) für das neue Terminal A am Newark Liberty International Airport (EWR).

image overlay Atlanta-Hartsfield International Airport (ATL) L-MOD Curbside Design
Gepäckabfertigungssysteme

Nord-Amerika

Internationaler Flughafen Atlanta-Hartsfield (ATL) L-MOD Bordsteinkantengestaltung

BNP Associates hat in Zusammenarbeit mit HOK die südöstlichen Bordsteinförderer und Delta Dash-Paketfördersysteme umgestaltet, um Platz für neue Vordachstützen zu schaffen, die im Rahmen des L-MOD-Programms hinzugefügt werden.

image overlay Tampa International Airport (TPA) Outbound Baggage System Security Enhancement Project
Gepäckabfertigungssysteme

Nord-Amerika

Tampa International Airport (TPA) Projekt zur Verbesserung der Sicherheit des Systems für ausgehendes Gepäck

BNP Associates, Inc. wurde von der Hillsborough County Aviation Authority beauftragt, das bestehende Design des 30% Checked Baggage Inspection System (CBIS) zu validieren und das 100% zu entwickeln, einschließlich der TSA-Zulassung.

Partnerschaften für Ergebnisse: Von Mega-Projekten zum mittelgroßen Erfolg.

Auf der Grundlage unseres guten Rufs wollen wir unsere Fähigkeit unter Beweis stellen, kosteneffiziente Lösungen für mittelgroße Projekte zu liefern, unsere Kunden über die neuesten Technologien zu informieren und ihren langfristigen Erfolg zu sichern. Wir legen Wert auf den Aufbau von Beziehungen zu unseren Kunden, nicht nur zu den Kunden, und arbeiten oft eng mit kleinen Teams in den Abteilungen für Flughafenplanung und -entwicklung zusammen, um außergewöhnliche Ergebnisse zu erzielen.

Informationen anfordern Siehe Projekte

BNP Associates, Inc. ist der weltweit führende Anbieter von spezialisierten Beratungsdienstleistungen für die Luftverkehrs- und Logistikbranche. 

© 2025 BNP Associates, INC. alle Rechte vorbehalten